Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

15 unique locations (78 components) - Page 1 of 2

Trent Basin Nottingham NG2 4DS (3 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (3 components)

0.9MW Battery storage located at Hampshire

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)
• 3 MW of DSR
• 3 MW of demand reduction
• 3MW Battery Storage facility located at Scarborough
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Salford Lodge Pitchill Evesham WR11 8SN (3 components)

0.1MW Tesla battery located at Eversham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Questmap Business park Drivers Wharf Northam Road Southampton SO14 0PF (3 components)

1.5MW battery located in Southampton

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Plot B at Severn Road Avonmouth BS10 7SE (13 components)
• 10.000MW DSR
• New Build Battery Energy Storage Systems
• The CMU will be formed of multiple individual Batteries. This site is to include a 17MW Battery Energy Storage System (BESS) that can either operate as import or export at will. The 17MW connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.36 MW
Philip Dennis Foodservice Roundswell Business Park Barnstaple Devon EX31 3TD (5 components)
• 3.75 MW storage battery located in Devon
• 3.750 MW of demand reduction
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Philip Dennis Foodservice Mullacott Cross Industrial Estate Ilfracombe Devon EX34 8PL (7 components)
• 0.261 MW of DSR
• 0.261 MW of demand reduction
• 0.261MW Storage Battery located in Devon
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Peel Common Battery Storage, Newgate Ln, Fareham, PO14 1JD (3 components)

20 MW storage battery

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 10 locations