Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

16 unique locations (135 components)

Active MW: 96.34 MW
Inactive MW: 1081.39 MW
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (1 component)

10.754 MW CHP Plant with 2 new Gas Turbines

Inactive • 2021-22 (T-4)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (5 components)

10.754 MW CHP Plant with 2 new Gas Turbines

Active • 2021-22 (T-4), 2018-19 (T-1)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (17 components)

8.3MW Gas Turbine installation

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Salisbury District Hospital, Odstock Road, Salisbury, Wiltshire. SP2 8BJ. (4 components)

1 x 850kW natural gas genset feeding site

Active • 2018-19 (T-1)
Poole Hospital Longfleet R Poole BH15 2JB (1 component)

0.85 MW CHP Located at Poole Hospital

Inactive • 2021-22 (T-4)
Poole Hospital Longfleet R Poole BH15 2JB (6 components)

0.85 MW CHP Located at Poole Hospital

Active • 2021-22 (T-4), 2018-19 (T-1)
PLESHEY CLOSE, WESTON-SUPER-MARE, BS22 (10 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Media City Prestwood Rd Salford M50 2EQ (1 component)

2MW CHP located at Salford

Inactive • 2021-22 (T-4)
Media City Prestwood Rd Salford M50 2EQ (6 components)

2MW CHP located at Salford

Active • 2021-22 (T-4), 2018-19 (T-1)
Hillsborough Leisure Centre, Beulah Road Sheffield S6 2AN (5 components)

0.3MW CHP, electronically

Active • 2018-19 (T-1)
Drakemyre, Dalry KA24 5JJ (53 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Cowie Stirling FK7 7BQ (1 component)

14.700MW CHP located at Cowie, Stirling.

Inactive • 2021-22 (T-4)
Cowie Stirling FK7 7BQ (6 components)

14.700MW CHP located at Cowie, Stirling.

Active • 2021-22 (T-4), 2018-19 (T-1)
Birds Eye Limited. Whapload Road, Lowestoft, Suffolk NR32 1XQ (12 components)
• 1 x 3.3 MW gas engine CHP plant
• 3.348 MW gas engine CHP plant
Active • 2021-22 (T-4), 2018-19 (T-1) ...
29 Patcham Terrace Wandsworth Great Britain SW8 4EX (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-1), 2025-26 (T-4)
Loading map...
Showing 16 locations