Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

232 unique locations (1579 components) - Page 8 of 10

Active MW: 292.61 MW
Inactive MW: 885.12 MW
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (7 components)
• 0.5MW of demand reduction
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• Sizewell B Power Station CMU 2: [SZ2-19] T_SIZB-2 + (50% x T_SIZB-D)
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Recycling Lives Recycling Park Longridge Road Preston Lancashire PR2 5BX (2 components)

2 MW demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Recycling Lives Recycling Park Longridge Road Preston Lancashire PR2 5BX (3 components)
• 1 x hydro turbine & synchronous generator
• 2 MW demand reduction
Active • 2027-28 (T-4), 2019-20 (T-1)
RIDING MILL PUMPING STATION Riding Mill NE43 7UA (1 component)

1.6MW of demand reduction

Inactive • 2019-20 (T-1)
RIDING MILL PUMPING STATION Riding Mill NE43 7UA (3 components)

1.6MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Riverside Crossgate Drive Queens Drive Industrial Estate NG2 1LW (2 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Riverside Crossgate Drive Queens Drive Industrial Estate NG2 1LW (2 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
RUFFORD STORAGE, RUFFORD COLLIERY LANE, RAINSWORTH, MANSFIELD, NOTTINGHAMSHIRE, NG21 0HR (9 components)
• 6MW of DSR
• A gas engine CHP site providing hot water to a local district heating network
• Tongland hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
5.17 MW
Sainsburys Tower B 11 Mitchigan Avenue Salford Quays Greater Manchester Great Britain M50 2HA (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Seamer Carr Landfill Seamer Scarborough YO12 4QA (3 components)
• 3 MW of DSR
• 3 MW of demand reduction
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Seamer Carr Landfill Seamer Scarborough YO12 4QA (4 components)
• 3 MW of DSR
• 3 MW of demand reduction
• 3MW Battery Storage facility located at Scarborough
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Skibeden - Skibeden Landfill, Harrogate Road Skipton, North Yorks, BD23 6AB (4 components)
• 0.35MWe CHP plant
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Skibeden - Skibeden Landfill, Harrogate Road Skipton, North Yorks, BD23 6AB
Active • 2025-26 (T-4), 2020-21 (T-4) ...
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (5 components)
• 0.250 MW of demand reduction
• 2MW of DSR
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (8 components)
• 0.250 MW of demand reduction
• 2MW of DSR
• DSR turn down
Inactive • 2023-24 (T-4), 2020-21 (T-1) ...
1.72 MW
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ (23 components)
• 1 x hydro turbine & synchronous generator
• Battery Energy storage linked to solar farm
• DSR component providing load turn-down at a steel melting facility with electric arc-furnaces
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (15 components)
• 4MW battery co-located with a solar farm
• 8.3MW Gas Turbine installation
• Unit 3 Cruachan pump storage hydro plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Stone Pit 1, Cotton Lane, Dartford, Kent DA9 9BB (7 components)
• N/A
• Storage equipment to be installed. The storage asset will be built in an existing building.
• The site will consist of a number of reciprocating machines - it is currently envisaged that these will be diesel.
Active • 2024-25 (T-4), 2021-22 (T-4) ...
SUBSTATION 2, LITTLEBROOK BATTERY STORAGE, ALBION ROAD, DARTFORD, KENT, DA1 5PZ (8 components)
• 4MW of DSR
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (7 components)
• Load reduction on site supported by non-exporting standby generation.
• Standby generation
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
• 6 x reciprocating engines
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Distribution Centre with behind the meter back-up generation.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
The Bridge Shopping Centre 11 Somers Road North PO1 1SL (11 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
11.30 MW
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (2 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (3 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations