Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

249 unique locations (1840 components) - Page 8 of 10

Active MW: 96.34 MW
Inactive MW: 1081.39 MW
Cowie, Stirling, FK7 7BQ (6 components)

2*7.5MW Gas Turbines

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Cowie Stirling FK7 7BQ (4 components)

14.700MW CHP located at Cowie, Stirling.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Cowie Sterling FK7 7BQ (12 components)
• 14.71 MW CHP generation
• 14.710 MW CHP generation
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Coveris Unit 6 Stanley, County Durham, DH9 9XH (3 components)

Coveris Unit 6 demand reduction site

Inactive • 2017-18 (TR)
Coveris Unit 5 Stanley, County Durham, DH9 9XH (3 components)

Several components

Inactive • 2017-18 (TR)
CORPORATION ROAD NEWPORT GWENT NP19 4XE (3 components)

Turn-down CMU with a de-rated volume of 0.869

Inactive • 2017-18 (TR)
Component has yet to be procured. (211 components)

Component has yet to be procured.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Commerical Road, Wolverhampton, WV1 3RD (5 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Clowne Rd, Stanfree, Chesterfield, S44 6AG (8 components)
• 1 x 800kW/1100KWh Lithium Ion Battery
• 4MW of DSR
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Claycliffe Rd, Barnsley, S75 1HS (8 components)
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (9 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2024-25 (T-4), 2022-23 (T-4) ...
CHILTERN COLD STORAGE CHILTERN HOUSE SHREWSBURY AVENUE PETERBOROUGH CAMBRIDGESHIRE PE2 7LB (3 components)

Turn down CMU with volume of 0.4MW before applying de-rating factor

Inactive • 2017-18 (TR)
Chichester Food Park, Bognor Rd, Chichester PO20 1NW, United Kingdom (73 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cherry Barn, ST10 4QS (1 component)

2MW (1 X 2 MW diesel gensets )

Inactive • 2020-21 (T-4)
Carlton,Stockton-On-Tees,TS21 1EA (7 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Cargill PLC, Trafford Park, Manchester, M17 1PA (68 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Camphill Road, Byfleet KT14 6EW (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
CALGARTH PS, WINDERMERE, CUMBRIA, LA23 (3 components)

0.2MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Calgarth PS Old Hall Road Windermere LA23 1JA (4 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Loading map...
Showing 25 locations