Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

249 unique locations (1840 components) - Page 2 of 10

Active MW: 96.34 MW
Inactive MW: 1081.39 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (13 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Thornham Lane, Emsworth, PO10 8DD (4 components)

18 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 18*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Inactive • 2020-21 (T-4), 2017-18 (T-1)
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (4 components)

0.9MW Battery storage located at Hampshire

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (5 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Bridge Shopping Centre 11 Somers Road North PO1 1SL (12 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.69 MW
Stroud Green Lane, Fareham, PO14 2HS (4 components)

40MW of Demand Reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Stoke Rygby Club, ST15 8TL (1 component)

0.5 MW diesel gensets

Inactive • 2020-21 (T-4)
Southbrook Farm, Sudbrook, Caldicot, NP26 5SR (3 components)

10 x 2MW gas generator units to be installed on designated land within Southbrook Farm

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
SOLAR FARM HIGH MEADOW FARM CARLTON VILLAGE CARLTON STOCKTON-ON-TEES DURHAM TS21 1EA (5 components)

Battery with a de-rated capacity of 1.043MW

Inactive • 2017-18 (T-1)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (3 components)

10.754 MW CHP Plant with 2 new Gas Turbines

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham, B7 5RE (6 components)

1 x 3.5MW natural gas fired turbine + 1 x 4.8MW natural gas fired turbine

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Slepe Farm Solar, Seven Acres Field, Slepe Farm, Slepe, Nr Poole, Dorset, BH16 6HS (3 components)

1 x 250kW/250kWh Lithium Ion Battery

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (10 components)
• 0.250 MW of demand reduction
• 2MW of DSR
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1.72 MW
Skibeden - Skibeden Landfill, Harrogate Road Skipton, North Yorks, BD23 6AB (3 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Skibeden - Skibeden Landfill, Harrogate Road Skipton, North Yorks, BD23 6AB

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Seamer Carr Landfill Seamer Scarborough YO12 4QA (4 components)

3MW Battery Storage facility located at Scarborough

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)
• 3 MW of DSR
• 3 MW of demand reduction
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
2.74 MW
Salisbury District Hospital, Odstock Road, Salisbury, Wiltshire. SP2 8BJ. (2 components)

1 x 850kW natural gas genset feeding site

Inactive • 2018-19 (T-1)
Salford Lodge Pitchill Evesham WR11 8SN (4 components)

0.1MW Tesla battery located at Eversham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Sainsburys Tower B 11 Mitchigan Avenue Salford Quays Greater Manchester Great Britain M50 2HA (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Loading map...
Showing 25 locations