Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

33 unique locations (202 components) - Page 2 of 2

Active MW: 393.19 MW
Inactive MW: 784.54 MW
Salisbury District Hospital, Odstock Road, Salisbury, Wiltshire. SP2 8BJ. (3 components)

1 x 850kW natural gas genset feeding site

Active • 2018-19 (T-1)
Skibeden - Skibeden Landfill, Harrogate Road Skipton, North Yorks, BD23 6AB (4 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Skibeden - Skibeden Landfill, Harrogate Road Skipton, North Yorks, BD23 6AB

Active • 2020-21 (T-4), 2017-18 (T-1)
Slepe Farm Solar, Seven Acres Field, Slepe Farm, Slepe, Nr Poole, Dorset, BH16 6HS (4 components)

1 x 250kW/250kWh Lithium Ion Battery

Active • 2020-21 (T-4), 2017-18 (T-1)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (4 components)

10.754 MW CHP Plant with 2 new Gas Turbines

Active • 2021-22 (T-4), 2018-19 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (16 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (6 components)

1.200MW BESS

Active • 2027-28 (T-4), 2026-27 (T-4) ...
UNIT 5 ALDERMAN WOOD ROAD TANFIELD LEA INDUSTRIAL EST SOUTH TANFIELD LEA STANLEY DH9 9XH (4 components)

Turn down CMU. De-rated volume of 0.313

Active • 2017-18 (TR)
Weeke Down, Lanham Lane, Winchester, SO22 5QL (4 components)

35 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 35*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Active • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 8 locations