Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

291 unique locations (846 components) - Page 1 of 12

Active MW: 292.61 MW
Inactive MW: 885.12 MW
10 Queens Drive , Kilmarnock, KA1 3XF (4 components)

Load curtailment (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1 MW - Oakhill Farm, ST10 4JH (1 component)

1 MW diesel gensets

LIMEJUMP LTD Not Prequalified ST10
Inactive • 2020-21 (T-4)
2 Salterns Lane, Burlesdon, Southampton, SO31 8DH (6 components)

38 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 38*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions … (2)

LIMEJUMP LTD Rejected SO31
Inactive • 2020-21 (T-4), 2017-18 (T-1)
2 Whitehouse Way, Peterlee, County Durham, SR8 2RA (5 components)

3 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional SR8
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (1 component)

4 MW of demand reduction

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2019-20 (T-1)
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (2 components)

4 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (3 components)

0.27MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
APPE Ellice Way Wrexham Technology Park 142 LL13 7YL (5 components)

This component is a site with load reduction

LIMEJUMP LTD Not Prequalified LL13
Inactive • 2016-17 (TR)
Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP (4 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP

LIMEJUMP LTD Not Prequalified RM15
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Barrasford Pumping Station Barrasford Hexham NE46 4AY (3 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2022-23 (T-3), 2019-20 (T-1) ...
Barrasford Pumping Station Barrasford Hexham NE46 4AY (6 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (8 components)

Battery Energy Storage System

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bedhampton Quay, Harts Farm Way, Havant, PO9 1JN (4 components)

29 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 29*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

LIMEJUMP LTD Rejected PO9
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (4 components)

3 x 1MW / 1.2 MWh BYD Lithium Ion Battery

LIMEJUMP LTD Rejected DN22
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 25 locations