Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

434 unique locations (3125 components) - Page 15 of 18

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Calgarth PS Old Hall Road Windermere LA23 1JA (3 components)
• 5 MW of demand reduction
• N/A
Inactive • 2022-23 (T-3), 2019-20 (T-1)
Calgarth PS Old Hall Road Windermere LA23 1JA (2 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
BWW033, Forum Pumping Station, Back Lane, Downside, Shepton Mallet, BA4 4JR (18 components)
• Load curtailment from refridgeration
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2023-24 (T-1) ...
BWW017, Chew Stoke, Chew Stoke Pump Station, Chew Stoke, Bristol, BS40 8XS (18 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
"Butchersfield Landfill Site, Rixton Old Hall, Manchester Road, Rixton, WARRINGTON, WA3 6EW" (5 components)
• 2 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Bulls Head Farm, Eakley Lanes, Newport Pagnell, MK16 8LP (4 components)

1 x 800kW/1100kWh Lithium Ion Battery

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bulls Head Farm Eakley Lanes Goldington Newport Pagnell Buckinghamshire MK16 8LP (2 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 10MW
• Generating Unit 1
Inactive • 2023-24 (T-4), 2021-22 (T-4)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (6 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• Multiple components
Inactive • 2021-22 (T-4), 2021-22 (T-1) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (4 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2024-25 (T-4), 2021-22 (T-1) ...
Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT (6 components)
• 1 x 0.8MW / 1.1 MWh BYD Lithium Ion Battery: at Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Brook Farm PV (DZS653A01) North Bradley Trowbridge Wiltshire BA14 9BT (3 components)
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
• Demand reduction
Inactive • 2022-23 (T-3), 2018-19 (T-1)
Brogoborugh Landfill Site Woburn Road Brogborough Bedfordshire MK43 0TN (3 components)

1 x Merlees 6MW reciprocating engine and all associated auxiliary equipment

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (13 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
• New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU (5 components)
• 20 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU
• Existing Generation on existing site - CHP
Active • 2024-25 (T-1), 2020-21 (T-4) ...
Breach Farm Cadley Lane Caldwell Swadlincote Derbyshire DE12 6RJ (2 components)

9.8MW of turn down

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Brancroft Way, Enfield EN3 7RG (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Brakes - Tamworth, Bonehill Road, TAMWORTH, Staffordshire B78 3HJ (21 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Brakes - Peterlee, 5-6 Burdon Drive, North West Industrial Estate, Peterlee, County Durham, SR8 2JH (24 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Brakes - Park Royal, Premier Park Road, London, NW10 7NZ (15 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Brakes - Hemsworth, 18 Hoyle Mill Road, Kinsley, Pontefract, WF9 5EG (23 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Bourne Park Solar Farm, Bourne Park, Piddlehinton, Dorset. DT2 7TU (4 components)
• 800kW/ 1100kWh BYD Lithium Ion Battery
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Botley Rd, Southampton SO32 1DR (5 components)

25 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 25*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Inactive • 2017-18 (T-1)
Loading map...
Showing 25 locations