LIMEJUMP LTD

291 unique locations (846 components) - Page 11 of 12

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham, B7 5RE (6 components)

1 x 3.5MW natural gas fired turbine + 1 x 4.8MW natural gas fired turbine

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (1 component)

10.754 MW CHP Plant with 2 new Gas Turbines

Inactive • 2018-19 (T-1)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (2 components)

10.754 MW CHP Plant with 2 new Gas Turbines

Inactive • 2021-22 (T-4), 2018-19 (T-1)
SOLAR FARM HIGH MEADOW FARM CARLTON VILLAGE CARLTON STOCKTON-ON-TEES DURHAM TS21 1EA (2 components)

Battery with a de-rated capacity of 1.043MW

Inactive • 2017-18 (T-1)
SOLAR FARM HIGH MEADOW FARM CARLTON VILLAGE CARLTON STOCKTON-ON-TEES DURHAM TS21 1EA (3 components)

Battery with a de-rated capacity of 1.043MW

Inactive • 2017-18 (T-1)
Stoke Rygby Club, ST15 8TL (1 component)

0.5 MW diesel gensets

LIMEJUMP LTD Not Prequalified ST15
Inactive • 2020-21 (T-4)
Stroud Green Lane, Fareham, PO14 2HS (4 components)

40MW of Demand Reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (6 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (3 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (4 components)

0.9MW Battery storage located at Hampshire

Battery Storage LIMEJUMP LTD Not Prequalified SO51
Inactive • 2021-22 (T-4), 2018-19 (T-1)
These sites are already generating and exporting to the distribution grid. We are aggregating their output in the context of and FFR Growth programme. (5 components)

Different sites with generation increase that already participate in the FFR growth programme

LIMEJUMP LTD Rejected
Inactive • 2016-17 (TR)
Thornham Lane, Emsworth, PO10 8DD (4 components)

18 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 18*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

LIMEJUMP LTD Rejected PO10
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (3 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Trent Basin Nottingham NG2 4DS (1 component)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive • 2018-19 (T-1)
Trent Basin Nottingham NG2 4DS (3 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (1 component)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional DE6
Inactive • 2019-20 (T-1)
Loading map...
Showing 25 locations