LIGHTSOURCE SPV 115 LIMITED

5 unique locations (249 components)

Active MW: 0.00 MW
Inactive MW: 4.64 MW
TAMARIND DRIVE NORRIS GREEN LIVERPOOL L11 (2 components)
• A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system to the required BSC standards. The battery facility is to share the connection capacity with the Solar Farm under a Grid Sharing Agreement (private wire network).
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. Edward Works, Llandarcy, SA10 6JY SS725948
Inactive • 2022-23 (T-1), 2019-20 (T-4)
Goosehall Farm, Factory Road, Burwell, CB25 0BN (5 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system …

Active • 2025-26 (T-4), 2022-23 (T-1)
EX2 (85 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
EH54 (115 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
DE74 (42 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...