Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

199 unique locations (1781 components) - Page 2 of 8

Active MW: 1446.50 MW
Inactive MW: 1065.75 MW
WATER PUMPING STATION, MIDDLEMEAD, WEST HANNINGFIELD, CHELMSFORD, CM3 8HS (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
14.00 MW
Walton Lane, Walton on Thames, KT12 1QP (4 components)

Diesel Generation

Active • 2017-18 (T-1)
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (25 components)
• Gas reciprocating engine
• Peak power plant
Active • 2023-24 (T-4), 2022-23 (T-3) ...
30.00 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2021-22 (T-1) ...
TWERTON PUMP STN, MIDLAND ROAD DEPOT, BATH, BA2 3BS (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
2.71 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (18 components)
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
To be determined (146 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (8 components)
• CHP
• Gas Fired - CHP
Active • 2023-24 (T-4), 2019-20 (T-1) ...
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (12 components)

2MW BESS

Active • 2022-23 (T-4), 2021-22 (T-4) ...
TA9 3QG (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA6 3JS (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA5 2AW (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA4 2UN (11 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations