Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

122 unique locations (407 components) - Page 2 of 5

Active MW: 187.97 MW
Inactive MW: 83.71 MW
WATER PUMPING STATION, MIDDLEMEAD, WEST HANNINGFIELD, CHELMSFORD, CM3 8HS (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU CM3
Active • 2025-26 (T-1), 2024-25 (T-1)
WATER PUMPING STATION, MIDDLEMEAD, WEST HANNINGFIELD, CHELMSFORD, CM3 8HS (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU CM3
Active • 2025-26 (T-1), 2024-25 (T-1)
WATER PUMPING STATION 1 ADJACENT, BENWELL COTTAGE, AXWELL PARK VIEW, NEWCASTLE UPON TYNE, NEWCASTLE UPON TYNE, NE15 6DP (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU NE15
Active • 2025-26 (T-1), 2024-25 (T-1)
UNMANNED SITE, YORKSHIRE WATER SERVICES, RIVELIN/NO.2 WTW, MANCHESTER ROAD (A61), RIVELIN, SHEFFIELD, S6 5SP (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 S6
Active • 2025-26 (T-1), 2024-25 (T-1)
UNMANNED SITE, YORKSHIRE WATER SERVICES, NUTWELL/WTW, NUTWELL LANE,ARMTHORPE, DONCASTER, SOUTH YORKSHIRE, DN3 3RX (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 DN3
Active • 2025-26 (T-1), 2024-25 (T-1)
UNMANNED SITE, YORKSHIRE WATER SERVICES, MOOR MONKTON/1 RPS, RED HOUSE LANE, BENINGBROUGH, YORK, YO30 1BY (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 YO30
Active • 2025-26 (T-1), 2024-25 (T-1)
UNMANNED SITE, YORKSHIRE WATER SERVICES, LOFTSOME BRIDGE/WTW, BRIDGE CRESCENT, WRESSLE, SELBY, YO8 6EN (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 YO8
Active • 2025-26 (T-1), 2024-25 (T-1)
UNMANNED SITE, YORKSHIRE WATER SERVICES, KNOSTROP/H LEVEL STW, KNOWSTHORPE LANE/KNOSTROP LANE, LEEDS, WEST YORKSHIRE, LS9 0PJ (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 LS9
Active • 2025-26 (T-1), 2024-25 (T-1)
UNMANNED SITE YORKSHIRE WATER SERVICES, DEWSBURY/STW REAR OF, MITCHELL LAITHES FARM, CLOUGH LANE, DEWSBURY, WF12 8LL (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 WF12
Active • 2025-26 (T-1), 2024-25 (T-1)
UNMANNED SITE, YORKSHIRE WATER SERVICES, COLNE BRIDGE/STW, COLNE BRIDGE, BRIDGE ROAD, COLNE BRIDGE, HUDDERSFIELD, HD5 0RH (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 HD5
Active • 2025-26 (T-1), 2024-25 (T-1)
University of East Anglia, Norwich Research Park, Norwich, NR4 7TJ (7 components)

CHP (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (10 components)

16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (3)

DSR Reciprocating engines IRWELL POWER LIMITED Existing Generating CMU CMU - Unproven DSR KIWI74 Irwell Power +4 more BL9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
TWERTON PUMP STN, MIDLAND ROAD DEPOT, BATH, BA2 3BS (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU BA2
Active • 2025-26 (T-1), 2024-25 (T-1)
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (9 components)
• Gas fired CHP unit (2)
• Gas CHP in St. Austell
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG55 Rejected PL26
Active • 2026-27 (T-4), 2025-26 (T-4) ...
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (4 components)
• Gas Fired - CHP (2)
• CHP
CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG33 KPEG33 +1 more SM2
Active • 2024-25 (T-1), 2023-24 (T-4) ...
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU TS7
Active • 2025-26 (T-1), 2024-25 (T-1)
SWANAGE WASTE WATER, TREATMENT WORKS, NR. MARINE VILLAS, HIGH STREET, SWANAGE, DORSET, BH19 2AP (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU BH19
Active • 2025-26 (T-1), 2024-25 (T-1)
Stoneykirk Road, Stranraer, DG9 7BU (9 components)

Gas fired CHP unit (3)

CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Base Power KPEG72 DG9
Active • 2024-25 (T-1), 2023-24 (T-1) ...
STEVENSTON SEWAGE TREATMENT WORKS, LUNDHOLM ROAD,STEVENSTON, AYRSHIRE,KA20 3LJ (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU KA20
Active • 2025-26 (T-1), 2024-25 (T-1)
Staithes Road, Preston, Hull, HU12 8TB (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
SMEATON LEYS PUMPING STATION, NEW ROAD, LITTLE SMEATON, PONTEFRACT, WF8 3LH (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU EDRU01 WF8
Active • 2025-26 (T-1), 2024-25 (T-1)
Showground, Bridgewater, TA6 6PS (1 component)

Energy from waste plant

Energy from Waste KIWI POWER LTD Existing Generating CMU TA6
Active • 2024-25 (T-1)
SEWAGE TREATMENT WORKS, HENDON DOCK, SUNDERLAND, 11000V MAIN SUPPLY, SR1 2ES (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU SR1
Active • 2025-26 (T-1), 2024-25 (T-1)
SEWAGE TREATMENT WORKS, CARGO FLEET, MIDDLESBROUGH,TS3 8AS (2 components)

On site reduction in consumption (2)

DSR KIWI POWER LTD Proven DSR CMU TS3
Active • 2025-26 (T-1), 2024-25 (T-1)
Loading map...
Showing 25 locations