Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

37 unique locations (626 components) - Page 1 of 2

Active MW: 1446.50 MW
Inactive MW: 1065.75 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (15 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2021-22 (T-1) ...
To be determined (146 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
TA9 3QG (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA6 3JS (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA5 2AW (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA4 2UN (11 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 7PE (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 6PH (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA24 6PJ (11 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA23 0YA (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA15 6UT (11 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
SP5 3EU (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
SP4 7BE (11 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
SN15 3QZ (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Runcorn site HQ, South Parade, PO Box 9, Runcorn, WA7 4JE (14 components)

Chemical manufacturer

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Rassau Industrial Estate, Ebbw Vale, Blaenau Gwent, NP23 5SD (15 components)

Peak power plant

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Milton Keynes University Hospital Standing Way, Eaglestone, Milton Keynes, MK6 5LD (15 components)

Generator at the Hospital

Active • 2023-24 (T-4), 2022-23 (T-3) ...
11.93 MW
Milton Keynes Hospital NHS Trust, Standing Way, Eaglestone, Milton Keynes, MK6 5LD (21 components)

Behind the Meter Generation

Active • 2023-24 (T-4), 2022-23 (T-3) ...
DT6 4EP (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
DT5 1BA (13 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
DT4 9AX (14 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
DT4 0DX (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
DT2 8PE (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
DT11 9HU (11 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations