KIWI POWER LTD

28 unique locations (287 components) - Page 1 of 2

Active MW: 1114.38 MW
Inactive MW: 1397.87 MW
Weighbridge Road, Shotton, Deeside, CH5 2LL (20 components)
• A gas fuelled generating station.
• Paper mill industrial site
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
16.00 MW
UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST, GLENFIELD CLINIC, GROBY ROAD, LEICESTER, LE3 9QP (10 components)
• A 20MW New Build gas fuelled generating station.
• CHP plant
• New build battery
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (19 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
30.00 MW
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (6 components)
• 3.6MW of demand reduction
• Gas generating unit(s)
• NEW BUILD GAS GENERATION STATION
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
TAMDOWN WAY SPRINGWOOD INDUSTRIAL ESTATE BRAINTREE ESSEX CM7 2QL (3 components)
• CMU consisting of a gas reciprocating engine and alternator
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• Solar T70 Based CHP System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Stockport Metropolitan Borough Council, Stopford House, Edward Street, Stockport, SK1 3UR (10 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Stockport DSR
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
29.10 MW
Southend University Hospital, Trust Prittlewell Chase, Southend-on-Sea, Westcliff on-Sea, SS0 0RY (12 components)
• A new build 19MW battery energy storage system
• CHP
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Shaw House Farm, Clitheroe Road, Whalley, Clitheroe, BB7 9AD (6 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• Water treatment centre
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Old Mill Industrial Estate, Mansfield, NG18 2AT (10 components)
• Gas fired reciprocating engines
• Gas reciprocating engines
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Northern Steel Stocks, Cross Street, Wolverhampton, WV1 2HS (15 components)
• Gas reciprocating engine
• N/A
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Milton Keynes Hospital NHS Trust, Standing Way, Eaglestone, Milton Keynes, MK6 5LD (22 components)
• 3 x 2MW gas generator units to be installed on a compound adjacent to Droppingwell Road
• Behind the Meter Generation
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Merseyside Waste Disposal Unit, The Old Coal Depot, Wallesey Bridge Road, Bidston Moss, Birkenhead, CH41 1EB (16 components)
• Generator at the Hospital
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Mannerberg Way, Scunthorpe, East Yorks, DN15 8XF (16 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
19.88 MW
London School of Hygiene & Tropical Medicine Keppel St, Bloomsbury, London WC1E 7HT (6 components)
• 20 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land on the south east side of Rycote Lane, Milton Common, Thame,  OX9 2PB (11 components)
• Battery Energy Storage System
• Gas peaking reciprocating engine
• Little Barford 1 OCGT . fuel type is distillate
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
• 5 MW of demand reduction
• CHP Unit
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Kilbuck Lane, Haydock Cross Industrial Estate, St. Helens, WA11 9SR (6 components)
• A new build gas fuelled generating plant at Haydock Cross Industrial Estate, WA11 9SR
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road SOUTH SHIELDS NE34 9PS (4 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• DSR Component providing load turn down at a retail store
• Furnaces
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND AT DRESSER CENTRE WHITWORTH STREET MANCHESTER M11 2NE (5 components)
• CMU consisting of multiple reciprocating engines and alternators
• Commercial printers
Inactive • 2022-23 (T-3), 2021-22 (T-1) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (12 components)
• Combined Cycle Gas Turbine plant
• Energy Centre comprising of lean burn acoustically treated natural gas reciprocating engines
• New build Combined Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (6 components)
• New build power station comprised of multiple reciprocating engines.
• Peak power plant
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Coatbridge, ML5 4UG, Scotland (3 components)
• Energy from Waste facility
• Gas fired reciprocating engines
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
BS23 0AP (11 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8.99MW.
• Existing CCGT unit
• Water treatment centre
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...