Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

28 unique locations (440 components) - Page 1 of 2

Active MW: 1114.38 MW
Inactive MW: 1397.87 MW
Windsor Battery West, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (9 components)
• Battery Storage
• Chemical manufacturer
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (6 components)
• CHP
• Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of batteries, power conversion systems, transformers, switchgear, monitoring and control systems.
• The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (19 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• EV charging at residential premises
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Tummel Power Station, Pitlochry, Perthshire, PH16 5SB (41 components)
• 1 x hydro turbine & synchronous generator
• Battery Energy Storage system operating alongside solar farm
• Solar Farm consisting of solar PV modules and inverters
Active • 2028-29 (T-4), 2027-28 (T-4) ...
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build windfarm.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (10 components)
• 2MW BESS
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (4 components)
• 49.990 MW battery energy storage system
• Battery Energy Storage System
• Generating Plant located at Station Road, Chartham, Kent, CT4 7JA
Active • 2025-26 (T-1), 2023-24 (T-1) ...
Rassau Industrial Estate, Ebbw Vale, Blaenau Gwent, NP23 5SD (9 components)
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• Peak power plant
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (7 components)
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• Existing OCGT plant.
• Hospital
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Penrhosgamedd, Bangor, Gwynedd, Wales, LL57 2PW (3 components)
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• Hospital
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Orchardbank 1 Limited Battery Storage Site, Orchard Loan, Oilfield Machinery Ltd, Orchard Bank Industrial Estate, Forfar, DD8 1TD (3 components)
• 9.999MW/9.999MWh BESS located to the rear of Dean Park Orchard Loan in Orchardbank Industrial Estate
• CHP unit
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (12 components)
• 7 MW of Battery Storage located at Grantham.
• A 7.5MW Battery Energy Storage System
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (13 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• New Battery Storage Site comprising brand new batteries & inverters
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Land on the south east side of Rycote Lane, Milton Common, Thame,  OX9 2PB (11 components)
• Battery Energy Storage System
• Gas peaking reciprocating engine
• Little Barford 1 OCGT . fuel type is distillate
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
• Battery Storage Plant
• Small gas fired OCGT.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land on South side of Charrington Farms, near Redhill, Surrey, RH2 8RB (2 components)
• Battery Energy Storage System
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Inactive • 2022-23 (T-4), 2020-21 (T-4)
EDF Energy, Hunterston B power station, West Kilbride, Ayrshire, KA23 9QX (40 components)
• Existing CCGT Unit
• Hunterston B Power Station CMU 7: [HU7-21] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-21] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
EDF Energy, Heysham 1 power station, Morecambe, Lancashire, LA3 2XF (14 components)
• 49.99MW Lithium-ion Energy Storage System
• Battery energy storage unit
• Peak power plant
Active • 2027-28 (T-4), 2024-25 (T-1) ...
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (9 components)
• A New Build 14MW Gas Fuelled Generating Station.
• Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Barking Power Station, Chequers Lane, Dagenham, Essex RM9 6PF (33 components)
• 6.000MW of storage located at Westoning
• Gas fired CHP unit
• Three gas turbines operating in open cycle mode. Not a Storage Facility.
Active • 2024-25 (T-4), 2024-25 (T-1) ...
Loading map...
Showing 25 locations