Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

69 unique locations (561 components) - Page 2 of 7

Active MW: 907.38 MW
Inactive MW: 1604.87 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (14 components)
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (2 components)

On site reduction in consumption (2)

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
Stoneykirk Road, Stranraer, DG9 7BU (23 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
STEVENSTON SEWAGE TREATMENT WORKS, LUNDHOLM ROAD,STEVENSTON, AYRSHIRE,KA20 3LJ (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
Staithes Road, Preston, Hull, HU12 8TB (31 components)
• CHP Unit
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
SMEATON LEYS PUMPING STATION, NEW ROAD, LITTLE SMEATON, PONTEFRACT, WF8 3LH (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
30.00 MW
Showground, Bridgewater, TA6 6PS (1 component)

Energy from waste plant

Active • 2024-25 (T-1)
SEWAGE TREATMENT WORKS, HENDON DOCK, SUNDERLAND, 11000V MAIN SUPPLY, SR1 2ES (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
SEWAGE TREATMENT WORKS, CARGO FLEET, MIDDLESBROUGH,TS3 8AS (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
Loading map...
Showing 10 locations