Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

188 unique locations (1452 components) - Page 2 of 19

Active MW: 907.38 MW
Inactive MW: 1604.87 MW
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (18 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
30.00 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
TWERTON PUMP STN, MIDLAND ROAD DEPOT, BATH, BA2 3BS (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
2.71 MW
Tunstead, Derbyshire, SK17 8TG (3 components)

Aggregates site

Inactive • 2017-18 (TR)
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (14 components)
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
To be determined (111 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Thorney Lane, North Iver, SL0 9HF (4 components)

Diesel Generation

Inactive • 2017-18 (T-1)
Loading map...
Showing 10 locations