KIWI POWER LTD

139 unique locations (1958 components) - Page 2 of 6

Active MW: 1114.38 MW
Inactive MW: 1397.87 MW
Stoneykirk Road, Stranraer, DG9 7BU (23 components)
• CHP unit
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Gas fired CHP unit
Active • 2024-25 (T-4), 2024-25 (T-1) ...
STEVENSTON SEWAGE TREATMENT WORKS, LUNDHOLM ROAD,STEVENSTON, AYRSHIRE,KA20 3LJ (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
Staithes Road, Preston, Hull, HU12 8TB (30 components)
• CHP Unit
• Gas fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Sowton Industrial Estate, Kestrel Way, Sowton Industrial Estate, Exeter EX2 7LN, United Kingdom (13 components)
• Cauldon Cement plant site - DSR participation through on-site shut down/ pause in production etc.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Showground, Bridgewater, TA6 6PS (1 component)

Energy from waste plant

Active • 2024-25 (T-1)
SEWAGE TREATMENT WORKS, HENDON DOCK, SUNDERLAND, 11000V MAIN SUPPLY, SR1 2ES (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
SEWAGE TREATMENT WORKS, CARGO FLEET, MIDDLESBROUGH,TS3 8AS (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
SEWAGE STARTER, HOLDENHURST STW, RIVERSIDE AVENUE, BOURNEMOUTH, BH7 7ES (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
2.71 MW
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (12 components)
• A gas engine CHP site providing steam and electricity to an industrial unit
• An Exiting diesel grid support plant
• CHP plant
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Runcorn site HQ, South Parade, PO Box 9, Runcorn, WA7 4JE (12 components)
• 10MW of onshore wind generation
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Chemical manufacturer
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Rocks Dryer, Rosvear Road, Bugle, St. Austell, PL26 8PJ (14 components)
• Gas CHP
• Gas CHP in St. Austell
• N/A
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (4 components)
• 49.990 MW battery energy storage system
• Battery Energy Storage System
• Generating Plant located at Station Road, Chartham, Kent, CT4 7JA
Active • 2025-26 (T-1), 2023-24 (T-1) ...
Ribblesdale Cement Works, West Bradford Road, Clitheroe, BB7 4QF (19 components)
• Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
• Hanson 2 - DSR Turn Down/ Load Reduction
• Storage facility
Active • 2024-25 (T-1), 2023-24 (T-4) ...
4.35 MW
Ribblesdale Cement Works, West Bradford Road, Clitheroe, BB7 4QF (1 component)

Proven reduction of site conumption

Active • 2025-26 (T-1)
4.35 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (15 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
• Water treatment centre
Active • 2026-27 (T-4), 2024-25 (T-1) ...
PUMPING TOWER;35,LOWER HALL LANE, LONDON, E4 8JG (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
PUMPING STATION, (DXH239A01), BLANDFORD ROAD, STURMINSTER MARSHALL, WIMBORNE, DORSET, BH21 4AG (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
2.71 MW
Port Talbot, West Glamorgan, SA13 1RH (1 component)

Hanson Port Talbot reduction of on site consumption

Active • 2024-25 (T-1)
3.35 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (27 components)
• A gas fuelled generating station.
• Generators at hospital site
• Peterhead CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (7 components)
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• Existing OCGT plant.
• Hospital
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Par CHP, Par Docks, Par, St. Austell, PL24 2BN (13 components)
• CHP unit
• Gas CHP located in St. Austell
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Padeswood Works, Chester Road, Mold, Flintshire, CH7 4HB (7 components)
• Proven reduction of site consumption
• Site is Load Reduction / DSR Turn Down
Active • 2025-26 (T-1), 2022-23 (T-4) ...
Orchardbank 1 Limited Battery Storage Site, Orchard Loan, Oilfield Machinery Ltd, Orchard Bank Industrial Estate, Forfar, DD8 1TD (3 components)
• 9.999MW/9.999MWh BESS located to the rear of Dean Park Orchard Loan in Orchardbank Industrial Estate
• CHP unit
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (23 components)
• CHP at a horticultural environment.
• CHP at horticultural site
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations