KIWI POWER LTD

64 unique locations (1184 components) - Page 1 of 3

Active MW: 1114.38 MW
Inactive MW: 1397.87 MW
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (16 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage).
• Peak power plant
• Reciprocating engine
Inactive • 2022-23 (T-4), 2021-22 (T-1) ...
530 London Road Thornton Heath London CR7 7YE (5 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Hospital
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Address: Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (21 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
• Gas fired CHP
• New build wind farm at Aberarder consisting of 12 wind turbines.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Ashgrove Road West, Aberdeen AB16 5UL (17 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• bus depot site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Blauegate Works, Stanley Way, Lathom, Skelmersdale, WN8 8EA (11 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• The facility consists of a series of gas fired generators. It connects to SPEN's network at 33kV.
• Total installed capacity is 6.6MW of gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Braunton Road Ashford Barnstaple Devon EX31 4BR (3 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bristol Avenue Moor Park Blackpool FY2 0LZ (4 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
BS23 0AP (11 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8.99MW.
• Existing CCGT unit
• Water treatment centre
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Cauldon Works, Yelsway Ln, Cauldon, Stoke-on-Trent ST10 3EQ (7 components)

Cauldon Cement plant site - DSR participation through on-site shut down/ pause in production etc.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (15 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
EDF Energy, Hunterston B power station, West Kilbride, Ayrshire, KA23 9QX (40 components)
• Hunterston B Power Station CMU 7: [HU7-21] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-20] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-21] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Heasandford Industrial Estate Widow Hill Ct Burnley BB10 2TT (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Hollinwood Avenue Chadderton OL9 8EP (3 components)

Commercial printers

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Hollinwood Avenue Chadderton OL9 8EP (3 components)

Commercial printers

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Kent Road, Southampton, S017 3EA (4 components)

CHP plant

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Ketton Works, Stamford, PE9 3SX (5 components)
• Hanson site - Is Load Reduction/ Turn Down
• Proven reduction of site consumption
Active • 2025-26 (T-1), 2022-23 (T-4) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (16 components)
• 10 x 1mw gas generator units to be installed on designated land at Burghfield Road Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• Existing CCGT
• One CHP, generating for site load which exceeds generating capacity. No aux load.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (18 components)
• Dungeness B Power Station CMU 22: [DN2222] T_DNGB22 + (50% x T_DNGB-D)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land at Kilbuck Lane, Haydock Cross Industrial Estate, St. Helens, WA11 9SR (6 components)
• A new build gas fuelled generating plant at Haydock Cross Industrial Estate, WA11 9SR
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Stanhope Industrial Estate, Wharf Road, Standford-Le-Hope SS17 0EH (17 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
• 5 x 2MW Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear at Stanhope industrial Estate
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Thornton Lane Markfield LE67 9TU (2 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating generator units to be installed on designated land at Thornton Lane, near Markfield.
Inactive • 2022-23 (T-4), 2021-22 (T-4)