Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

127 unique locations (1017 components) - Page 4 of 6

Active MW: 1114.38 MW
Inactive MW: 1397.87 MW
Hollinwood Avenue Chadderton OL9 8EP (3 components)

Commercial printers

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Haxby Rd, York, YO91 1XY (17 components)
• CHP Unit
• Gas fired CHP unit
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Gothic Cottage Farm Mill Rd East Ruston Norwich NR12 9HS (3 components)
• A 0.18 MW Storage facility located in Norwich
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Gedling Energy Park, land off Arnold lane, Gedling, Nottingham NG4 4GZ (8 components)
• 1 x MWM TCG 2020
• Aggregate CMU from Multiple Sources
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Francis Avenue Bournemouth BH11 8NX (3 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Former Watnall Brickworks, Long Lane, Watnall, Nottinghamshire, NG16 1HY (3 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Peak power plant
Inactive • 2022-23 (T-3), 2017-18 (T-1)
Fasnakyle Power Station, Cannich, Inverness-shire, IV4 7NB (3 components)
• Generating Unit 1
• Generating unit 3.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Ervin Amasteel 33KV connection George Henry Road Breat Bridge Tipton West Midlands DY4 7BZ (4 components)
• 2.6MW of demand reduction
• CHP
• Turn down CMU
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Ernesettle Road Plymouth PL5 2TT (1 component)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

Inactive • 2022-23 (T-4)
Elevator Road, Stretford, Manchester, M17 1BR (1 component)

Water treatment centre

Inactive • 2021-22 (T-4)
DT5 1BA (11 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
DT4 9AX (12 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
DT4 0DX (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
DT2 8PE (8 components)

Water treatment centre

Inactive • 2018-19 (T-1), 2017-18 (T-1)
DT11 9HU (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Coatbridge, ML5 4UG, Scotland (3 components)
• Energy from Waste facility
• Gas fired reciprocating engines
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Christchurch Bournemouth BH23 2JY (2 components)

Water treatment centre

Inactive • 2022-23 (T-3), 2019-20 (T-1)
Chenhalls Road St Erth Hale Cornwall TR27 6LA (3 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cauldon Works, Yelsway Ln, Cauldon, Stoke-on-Trent ST10 3EQ (7 components)

Cauldon Cement plant site - DSR participation through on-site shut down/ pause in production etc.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations