Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

166 unique locations (1104 components) - Page 3 of 7

Active MW: 849.23 MW
Inactive MW: 1663.02 MW
SWANAGE WASTE WATER, TREATMENT WORKS, NR. MARINE VILLAS, HIGH STREET, SWANAGE, DORSET, BH19 2AP (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
Stoneykirk Road, Stranraer, DG9 7BU (30 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
STEVENSTON SEWAGE TREATMENT WORKS, LUNDHOLM ROAD,STEVENSTON, AYRSHIRE,KA20 3LJ (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
Staithes Road, Preston, Hull, HU12 8TB (44 components)
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Showground, Bridgewater, TA6 6PS (1 component)

Energy from waste plant

Active • 2024-25 (T-1)
SEWAGE TREATMENT WORKS, HENDON DOCK, SUNDERLAND, 11000V MAIN SUPPLY, SR1 2ES (4 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
SEWAGE TREATMENT WORKS, CARGO FLEET, MIDDLESBROUGH,TS3 8AS (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
SEWAGE STARTER, HOLDENHURST STW, RIVERSIDE AVENUE, BOURNEMOUTH, BH7 7ES (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
2.71 MW
Rocks Dryer, Rosvear Road, Bugle, St. Austell, PL26 8PJ (17 components)
• Gas CHP
• Gas CHP in St. Austell
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Riverside Shopping Centre Huddersfield Road West Yorkshire Great Britain HD9 3AY (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-1), 2025-26 (T-4)
Ribblesdale Cement Works, West Bradford Road, Clitheroe, BB7 4QF (26 components)

Hanson 2 - DSR Turn Down/ Load Reduction

Active • 2024-25 (T-1), 2023-24 (T-4) ...
4.35 MW
Ribblesdale Cement Works, West Bradford Road, Clitheroe, BB7 4QF (2 components)

Proven reduction of site conumption

Active • 2025-26 (T-1)
4.35 MW
Repton Road, Measham, Swadlincote, DE12 7DT (28 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
Radford Way Essex Great Britain CM12 0EG (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-1), 2025-26 (T-4)
Queen Elizabeth Barracks Sandy Lane Church Crookham Hampshire Great Britain GU52 8LB (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-1), 2025-26 (T-4)
PUMPING TOWER;35,LOWER HALL LANE, LONDON, E4 8JG (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
PUMPING STATION, (DXH239A01), BLANDFORD ROAD, STURMINSTER MARSHALL, WIMBORNE, DORSET, BH21 4AG (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
2.71 MW
Port Talbot, West Glamorgan, SA13 1RH (1 component)

Hanson Port Talbot reduction of on site consumption

Active • 2024-25 (T-1)
3.35 MW
PORTRACK SEWAGE PUMPING STATION, PORTRACK LANE, STOCKTON-ON-TEES, NON PAF N, NORTHUMBRIAN WATER LTD, TS18 2AN (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
PO13 (30 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Pelham Drive, Bootle, Merseyside, L30 4XN (3 components)

CHP plant

Active • 2022-23 (T-4), 2019-20 (T-1)
Par CHP, Par Docks, Par, St. Austell, PL24 2BN (19 components)
• CHP unit
• Gas CHP located in St. Austell
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 25 locations