Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

147 unique locations (1079 components) - Page 2 of 6

Active MW: 856.19 MW
Inactive MW: 1656.06 MW
Stockport Metropolitan Borough Council, Stopford House, Edward Street, Stockport, SK1 3UR (10 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Stockport DSR
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
29.10 MW
St. Alban's Road Watford Herts WD24 7RG (3 components)

Commercial printers

Inactive • 2022-23 (T-4), 2019-20 (T-1)
St. Alban's Road Watford Herts WD24 7RG (2 components)

Commercial printers

Inactive • 2022-23 (T-4), 2019-20 (T-1)
St Albans Road, Watford, Hertfordshire, WD2 5RG (4 components)

Diesel Generation

Inactive • 2017-18 (T-1)
Staines Road Chertsey, KT16 8PX (4 components)

Diesel Generation

Inactive • 2017-18 (T-1)
SP5 3EU (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SP4 7BE (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Southend University Hospital, Trust Prittlewell Chase, Southend-on-Sea, Westcliff on-Sea, SS0 0RY (12 components)
• A new build 19MW battery energy storage system
• CHP
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
SN15 3QZ (8 components)

Water treatment centre

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Roydon Pumping Station, Harlow Road, Harlow, Essex, CM19 5HF (3 components)

Water Pumping Station

Inactive • 2017-18 (TR)
Riverside Crossgate Drive Queens Drive Industrial Estate NG2 1LW (2 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Repton Road, Measham, Swadlincote, DE12 7DT (19 components)
• CHP unit
• Gas fired CHP unit
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Rassau Industrial Estate, Ebbw Vale, Blaenau Gwent, NP23 5SD (9 components)
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• Peak power plant
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Plot II, Pye Bridge Industrial Estate, Pye Bridge, Somercotes, Derbyshire, DE55 4NQ (5 components)
• 3 x 3MW gas reciprocating engines used for power generation, with associated infrastructure.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Penrhosgamedd, Bangor, Gwynedd, Wales, LL57 2PW (3 components)
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• Hospital
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Penrhosgamedd, Bangor, Gwynedd, Wales, LL57 2PW (4 components)

Hospital

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations