Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

12 unique locations (68 components)

Active MW: 36.89 MW
Inactive MW: 28.23 MW
Burnside Mills, Kendal,Cumbria,LA9 6PZ (6 components)

Gas fired CHP unit (3)

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG52 KPEG52 Rejected LA9
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Downs Rd, Sutton SM2 5PT (3 components)
• Behind the Meter CHP
• Emergency Behind the Meter Diesel Generator
Active • 2025-26 (T-1), 2025-26 (T-4)
Fulham Road, London, SW3 6JJ (1 component)

Emergency Behind the Meter Diesel Generator

DSR KIWI POWER LTD Proven DSR CMU SW3
Active • 2025-26 (T-4)
Keppel St, London WC1E 7HT (1 component)

Emergency Behind the Meter Diesel Generator

DSR KIWI POWER LTD Proven DSR CMU WC1E
Active • 2025-26 (T-4)
Ketton Works, Stamford, PE9 3SX (7 components)
• Hanson site - Is Load Reduction/ Turn Down (2)
• Proven reduction of site consumption
DSR KIWI POWER LTD Proven DSR CMU CMU - Unproven DSR KIWI76 PE9
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Lochaber Smelter Fort William Scotland PH33 6TH (7 components)

Furnaces (3)

DSR KIWI POWER LTD Proven DSR CMU CMU - Unproven DSR KIWI74 CMU -Unproven DSR KIWI71 PH33
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Mill Nurseries, Ottringham Road, Keyingham, Hull, HU12 9RX (8 components)

Gas fired CHP unit (3)

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG57 KPEG57 HU12
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Padeswood Works, Chester Road, Mold, Flintshire, CH7 4HB (7 components)
• Site is Load Reduction / DSR Turn Down (2)
• Proven reduction of site consumption
DSR KIWI POWER LTD Proven DSR CMU CMU - Unproven DSR KIWI76 CH7
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Par CHP, Par Docks, Par, St. Austell, PL24 2BN (9 components)
• CHP unit (2)
• Gas CHP located in St. Austell
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG53 Rejected PL24
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Piccadilly, Stockport SK1 3UR (1 component)

Emergency Behind the Meter Diesel Generator

DSR KIWI POWER LTD Proven DSR CMU SK1
Active • 2025-26 (T-4)
Rocks Dryer, Rosvear Road, Bugle, St. Austell, PL26 8PJ (9 components)
• Gas CHP (2)
• Gas CHP in St. Austell
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG54 Rejected PL26
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (9 components)
• Gas fired CHP unit (2)
• Gas CHP in St. Austell
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG55 Rejected PL26
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 12 locations