Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

4 unique locations (31 components)

Active MW: 1114.38 MW
Inactive MW: 1397.87 MW
Coatbridge, ML5 4UG, Scotland (3 components)
• Energy from Waste facility
• Gas fired reciprocating engines
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (13 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• New Battery Storage Site comprising brand new batteries & inverters
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Newhaven ERF, North Quay Rd, Newhaven, East Sussex, BN9 0AB (9 components)
• Generators on hospital site
• Steam turbine at energy from waste facility located in Newhaven East Sussex
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (6 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
• Gas CHP located in St. Austell
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 4 locations