KIWI POWER LTD

36 unique locations (602 components) - Page 1 of 2

Active MW: 1114.38 MW
Inactive MW: 1397.87 MW
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (16 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage).
• Peak power plant
• Reciprocating engine
Inactive • 2022-23 (T-4), 2021-22 (T-1) ...
530 London Road Thornton Heath London CR7 7YE (5 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Hospital
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (27 components)
• A gas fuelled generating station.
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT Baglan Unit 1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Brunel Way, Briton Ferry, SA11 2GA (14 components)
• Gas fired reciprocating engines.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
BS23 0AP (11 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8.99MW.
• Existing CCGT unit
• Water treatment centre
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Coatbridge, ML5 4UG, Scotland (3 components)
• Energy from Waste facility
• Gas fired reciprocating engines
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (79 components)
• CMU consisting of multiple gas reciprocating engines and alternators
• Energy facility comprising of reciprocating engine sets.
• TBC
Active • 2026-27 (T-4), 2024-25 (T-4) ...
EDF Energy, Hunterston B power station, West Kilbride, Ayrshire, KA23 9QX (40 components)
• Existing CCGT Unit
• Hunterston B Power Station CMU 7: [HU7-21] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-21] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (23 components)
• Generating Unit 2
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (12 components)
• Combined Cycle Gas Turbine plant
• Energy Centre comprising of lean burn acoustically treated natural gas reciprocating engines
• New build Combined Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road SOUTH SHIELDS NE34 9PS (4 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• DSR Component providing load turn down at a retail store
• Furnaces
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Kilbuck Lane, Haydock Cross Industrial Estate, St. Helens, WA11 9SR (6 components)
• A new build gas fuelled generating plant at Haydock Cross Industrial Estate, WA11 9SR
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
• 5 MW of demand reduction
• CHP Unit
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Seal Sands Road, Seal Sands, Middlesbrough, TS2 1UB (11 components)
• Gas fired CHP unit
• New build power station comprised of multiple reciprocating engines.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
Land off Nottingham Rd, Loughborough Leicestershire LE11 1ET (18 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land off Sookholme Road, Vernon Street Industrial Estate, Shirebrook, Mansfield, NG20 8SG (24 components)
• Reciprocating genset
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land on the south east side of Rycote Lane, Milton Common, Thame,  OX9 2PB (11 components)
• Battery Energy Storage System
• Gas peaking reciprocating engine
• Little Barford 1 OCGT . fuel type is distillate
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loddon Power,Unit A, The Loddon Centre, Wade Road, Basingstoke RG24 8FL (6 components)
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the Local distribution network and local gas network.
• A gas engine CHP site providing hot water to a local district heating network
• Peak power plant
Active • 2026-27 (T-4), 2023-24 (T-4) ...
London School of Hygiene & Tropical Medicine Keppel St, Bloomsbury, London WC1E 7HT (6 components)
• 20 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Merseyside Waste Disposal Unit, The Old Coal Depot, Wallesey Bridge Road, Bidston Moss, Birkenhead, CH41 1EB (16 components)
• Generator at the Hospital
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Milton Keynes Hospital NHS Trust, Standing Way, Eaglestone, Milton Keynes, MK6 5LD (22 components)
• 3 x 2MW gas generator units to be installed on a compound adjacent to Droppingwell Road
• Behind the Meter Generation
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Northern Steel Stocks, Cross Street, Wolverhampton, WV1 2HS (15 components)
• Gas reciprocating engine
• N/A
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...