Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

52 unique locations (823 components) - Page 1 of 3

Active MW: 1446.50 MW
Inactive MW: 1065.75 MW
Weighbridge Road, Shotton, Deeside, CH5 2LL (26 components)

Paper mill industrial site

Active • 2023-24 (T-1), 2023-24 (T-4) ...
16.00 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (15 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (25 components)
• Gas reciprocating engine
• Peak power plant
Active • 2023-24 (T-4), 2022-23 (T-3) ...
30.00 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2021-22 (T-1) ...
To be determined (146 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (12 components)

2MW BESS

Active • 2022-23 (T-4), 2021-22 (T-4) ...
TA9 3QG (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA6 3JS (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA5 2AW (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA4 2UN (11 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 7PE (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 6PH (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA24 6PJ (11 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA23 0YA (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
TA15 6UT (11 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB (1 component)

Generating Plant located at Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB

Inactive • 2021-22 (T-4)
Stockport Metropolitan Borough Council, Stopford House, Edward Street, Stockport, SK1 3UR (8 components)

Stockport DSR

Active • 2023-24 (T-4), 2022-23 (T-3) ...
29.10 MW
Station Road, Chartham, Kent, CT4 7JA (1 component)

Generating Plant located at Station Road, Chartham, Kent, CT4 7JA

Inactive • 2021-22 (T-4)
SP5 3EU (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
SP4 7BE (11 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
SN15 3QZ (12 components)

Water treatment centre

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Runcorn site HQ, South Parade, PO Box 9, Runcorn, WA7 4JE (14 components)

Chemical manufacturer

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Ribblesdale Cement Works, West Bradford Road, Clitheroe, BB7 4QF (21 components)

Hanson 2 - DSR Turn Down/ Load Reduction

Active • 2024-25 (T-1), 2023-24 (T-4) ...
12.00 MW
Rassau Industrial Estate, Ebbw Vale, Blaenau Gwent, NP23 5SD (15 components)

Peak power plant

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Northern Steel Stocks, Cross Street, Wolverhampton, WV1 2HS (19 components)
• Gas reciprocating engine
• Peak power plant
Active • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations