Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

INOVYN CHLORVINYLS LIMITED

2 unique locations (12 components)

Active MW: 131.20 MW
Inactive MW: 124.07 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED, UK (6 components)
• The CMU TEES16 consists of two identical components. TEES16-1 is one gas-fired Jenbacher CHP engine with a generation capacity of 3.352MW. The total CMU generation capacity is declared 6.704MW. The new development is expected to run about 4,000 hours p.a. and will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• This is a long standing existing CHP unit located on land within a manufacturing site.
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2024-25 (T-4), 2017-18 (T-1)
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (6 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 2 locations