Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

INFINIS ALTERNATIVE ENERGIES LIMITED

36 unique locations (166 components) - Page 2 of 2

Active MW: 40.61 MW
Inactive MW: 63.65 MW
Danes Moss Landfill Site, Gawsworth, Macclesfield, Cheshire, SK11 9QP (2 components)

The site comprises of gas reciprocating unit(s)

Active • 2022-23 (T-4)
Danes Moss Landfill Site, Gawsworth, Macclesfield, Cheshire, SK11 0LR (3 components)

Gas fired reciprocating engine(s)

Active • 2023-24 (T-4), 2022-23 (T-3)
Burntstump Landfill Site, Ollerton Road, Arnold, Nottinghamshire, NG5 8PR (1 component)

The site comprises of gas reciprocating unit(s)

Active • 2022-23 (T-4)
Bidston Landfill Site, Bidston Industrial Estate, Wirral, Merseyside, CH44 2HE (4 components)
• Gas fired reciprocating engine(s)
• The site comprises of gas reciprocating unit(s)
Active • 2023-24 (T-4), 2022-23 (T-3) ...
Aveley (N) Sandy Lane Aveley South Ockendon Essex RM15 4XP (17 components)
• Gas fired generating unit
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network.
Active • 2021-22 (T-4), 2020-21 (T-1) ...
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (3 components)

Gas reciprocating engines

Active • 2027-28 (T-4), 2025-26 (T-1) ...
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (28 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6ZA (9 components)

The system comprises of two gas reciprocating engines provided an exported output of around 2MW.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (17 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 11 locations