Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

HC ESS2 LIMITED

8 unique locations (94 components)

Active MW: 68.53 MW
Inactive MW: 225.23 MW
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (8 components)
• Gas and/or diesel reciprocating engines.
• battery storage
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Rigby Landfill Site, Chorley Road, Standish, Wigan, WN1 2XL (2 components)
• A 2.5MW New Build Battery Storage System
• The site comprises of gas reciprocating unit(s)
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire,BD15 0BZ (5 components)
• New build battery storage.
• battery storage with other generation
Active • 2025-26 (T-4), 2023-24 (T-1) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (15 components)
• A New Build 2.5MW Generation Battery Site
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Albion Road, Dartford, Kent, UK, DA1 5PZ (7 components)
• A 2.5MW New Build Battery Storage System
• A New Build 2.5MW Generation Battery Site
• A New Build Generation Battery Site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Albion Road, Dartford, Kent, DA1 5PZ (12 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 8 locations