HARTREE SOLUTIONS (UK) LIMITED

7 unique locations (293 components)

Active MW: 18.09 MW
Inactive MW: 1515.88 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land On The North Side Of Kerfoot Street Warrington, WA2 8NT (7 components)
• CMU consisting of multiple reciprocating engines and alternators
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• New build power station comprised of multiple reciprocating engines.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (11 components)
• A gas engine CHP site providing hot water to a local district heating network
• A gas fuelled generating station.
• New build power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...