Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

HARTREE SOLUTIONS (UK) LIMITED

4 unique locations (180 components)

Active MW: 184.41 MW
Inactive MW: 1349.56 MW
ASDA Import Center, Dabholm Rd, Middlesbrough, TS6 7RU (12 components)
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
• battery energy storage system
Active • 2028-29 (T-4), 2024-25 (T-1) ...
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (19 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CMU comprising of battery storage and associated plant
• New build power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land On The North Side Of Kerfoot Street Warrington, WA2 8NT (7 components)
• CMU consisting of multiple reciprocating engines and alternators
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• New build power station comprised of multiple reciprocating engines.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
Loading map...
Showing 4 locations