HARTREE SOLUTIONS (UK) LIMITED

2 unique locations (19 components)

Active MW: 84.02 MW
Inactive MW: 1449.96 MW
Merlin Park Burscough L40 8JY (15 components)

Works required to complete the site will include:- 1 Construction of a Grid Connection between the site and the Distribution Network 2 Construction of gas connection between the site and …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Merlin Park Burscough L40 8JY (4 components)

Works required to complete the site will include:- 1 Construction of a Grid Connection between the site and the Distribution Network 2 Construction of gas connection between the site and …

Inactive • 2021-22 (T-1), 2020-21 (T-1) ...