GSES 1 LIMITED

56 unique locations (850 components) - Page 1 of 3

Active MW: 32.63 MW
Inactive MW: 150.20 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (64 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (5 components)

1.200MW of battery storage located at Durham.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (2 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …

Active • 2028-29 (T-4)
BOC Fawley, Cadland Road, Hythe, SO45 3NX (21 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production processes. DSR delivered through reduction of import at site boundary, primarily process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Bodelwyddan, Royal Welch Ave, Bodelwyddan, Rhyl LL18 5TQ, United Kingdom (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Breach Farm Caldwell Swadlincote Derbyshire DE12 6RJ (1 component)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.

Inactive • 2020-21 (T-4)
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (2 components)

Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the …

Active • 2028-29 (T-4)
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (7 components)

0.800MW of battery storage located at Wiltshire.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.65 MW
Brunel Way, Briton Ferry, SA11 2GA (16 components)
• Gas fired reciprocating engines.
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Carlton, Stockton-on-Tees, TS21 1EA (6 components)

1.200MW of battery storage located at Stockton-on-Tees.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.65 MW
Carlton, Stockton-on-Tees, TS21 1EA (4 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Chenhalls Road St Erth Hale Cornwall TR27 6LA (7 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cleveland Potash Ltd, Boulby Mine, Loftus, Saltburn TS13 4UZ (6 components)

Purpose Build Battery designed to be compliant in the FFR market.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Component has yet to be procured. (211 components)

Component has yet to be procured.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (5 components)

0.400MW of battery storage located at Stratford-Upon-Avon.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (8 components)
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (5 components)

1.200MW of battery storage located at Preston.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (5 components)

1.200MW of battery storage located at Preston.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (5 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2025-26 (T-4)
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility.

Inactive • 2023-24 (T-1)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (4 components)

1.000MW of battery storage located at Staffordshire.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (3 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
High Flatworth, North Shields, NE29 7UZ (8 components)

Reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Loading map...
Showing 25 locations