GSES 1 LIMITED

43 unique locations (273 components) - Page 1 of 2

Active MW: 54.72 MW
Inactive MW: 128.11 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6ZA (5 components)
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2020-21 (T-1) ...
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (3 components)

1.200MW of battery storage located at Durham.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (7 components)
• Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• New Build Battery Energy Storage Systems
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2028-29 (T-4), 2024-25 (T-1) ...
Breach Farm Caldwell Swadlincote Derbyshire DE12 6RJ (1 component)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.

Inactive • 2020-21 (T-4)
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (3 components)
• Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Connah's Quay PS Unit 3 CCGT
Active • 2028-29 (T-4), 2022-23 (T-4)
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (6 components)

0.800MW of battery storage located at Wiltshire.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.65 MW
Carlton, Stockton-on-Tees, TS21 1EA (2 components)

1.200MW of battery storage located at Stockton-on-Tees.

Inactive • 2022-23 (T-3), 2020-21 (T-1)
Carlton, Stockton-on-Tees, TS21 1EA (7 components)
• 1.200MW of battery storage located at Stockton-on-Tees.
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.65 MW
Cleveland Potash Ltd, Boulby Mine, Loftus, Saltburn TS13 4UZ (5 components)

Purpose Build Battery designed to be compliant in the FFR market.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (3 components)

0.400MW of battery storage located at Stratford-Upon-Avon.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (2 components)

0.400MW of battery storage located at Stratford-Upon-Avon.

Inactive • 2020-21 (T-1)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (7 components)
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Fairy Lane, Sale, Trafford, Greater Manchester M33 2JU (1 component)

1.200MW of battery storage located at Stockton-on-Tees.

Inactive • 2023-24 (T-4)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (2 components)

1.200MW of battery storage located at Preston.

Inactive • 2022-23 (T-3), 2020-21 (T-1)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (3 components)

1.200MW of battery storage located at Preston.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (13 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• CMU consisting of a gas reciprocating engine and alternator
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility.

Inactive • 2023-24 (T-1)
Forkers Yard, Off Shaw Street, West Bromwich, B70 0TX (1 component)

20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY

Active • 2025-26 (T-4)
Grafham INTAKE WA, GRAFHAM INTAKE (OFFORD) WA S2, Offord, HUNTINGDON Cambridgeshire, PE19 5RG, (8 components)
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2026-27 (T-4), 2020-21 (T-4) ...
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (16 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Genset 2.
• This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" status FCC Buckinghamshire Ltd. 300kT Energy from Waste Plant with c. 25MW net output. Auxiliary load is not included in the connection capacity i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (3 components)

1.000MW of battery storage located at Staffordshire.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (5 components)
• 1.000MW of battery storage located at Staffordshire.
• 40MW of Demand Reduction
• Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (20 components)
• A new build 7.5MW gas fuelled generating station.
• A new build, gas fuelled generation station.
• Battery Storage Plant
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Hungerford Farm, Winchfield, Hook, RG27 8SW (3 components)

1.200MW of battery storage located at Hook.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...