GSES 1 LIMITED

42 unique locations (128 components) - Page 1 of 2

Active MW: 14.14 MW
Inactive MW: 45.33 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (1 component)

1.200MW of battery storage located at Durham.

DSR GSES 1 LIMITED Unproven DSR CMU ABS1 TS22
Inactive • 2020-21 (T-1)
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (2 components)

1.200MW of battery storage located at Durham. (2)

DSR GSES 1 LIMITED Unproven DSR CMU ABS1 TS22
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (5 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (1B) +1 more TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Breach Farm Caldwell Swadlincote Derbyshire DE12 6RJ (1 component)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.

GSES 1 LIMITED New Build Generating CMU Breach Farm DE12
Inactive • 2020-21 (T-4)
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (5 components)

Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (1B) +1 more BA14
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (3 components)

0.800MW of battery storage located at Wiltshire. (3)

DSR GSES 1 LIMITED Unproven DSR CMU ABS1 BA14
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Carlton, Stockton-on-Tees, TS21 1EA (1 component)

1.200MW of battery storage located at Stockton-on-Tees.

DSR GSES 1 LIMITED Unproven DSR CMU ABS1 TS21
Inactive • 2020-21 (T-1)
Carlton, Stockton-on-Tees, TS21 1EA (2 components)

1.200MW of battery storage located at Stockton-on-Tees. (2)

DSR GSES 1 LIMITED Unproven DSR CMU ABS1 TS21
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Carlton, Stockton-on-Tees, TS21 1EA (5 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (1B) +1 more TS21
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cleveland Potash Ltd, Boulby Mine, Loftus, Saltburn TS13 4UZ (1 component)

Purpose Build Battery designed to be compliant in the FFR market.

GSES 1 LIMITED New Build Generating CMU CMU - New Build Generation KPBL01 TS13
Inactive • 2017-18 (T-1)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (1 component)

0.400MW of battery storage located at Stratford-Upon-Avon.

DSR GSES 1 LIMITED Unproven DSR CMU ABS2 CV37
Inactive • 2020-21 (T-1)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (2 components)

0.400MW of battery storage located at Stratford-Upon-Avon. (2)

DSR GSES 1 LIMITED Unproven DSR CMU ABS2 CV37
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)

Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (2B) +1 more CV37
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (1 component)

1.200MW of battery storage located at Preston.

DSR GSES 1 LIMITED Unproven DSR CMU ABS1 PR2
Inactive • 2020-21 (T-1)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (1 component)

1.200MW of battery storage located at Preston.

DSR GSES 1 LIMITED Unproven DSR CMU ABS2 PR2
Inactive • 2020-21 (T-1)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (2 components)

1.200MW of battery storage located at Preston. (2)

DSR GSES 1 LIMITED Unproven DSR CMU ABS1 PR2
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (2 components)

1.200MW of battery storage located at Preston. (2)

DSR GSES 1 LIMITED Unproven DSR CMU ABS2 PR2
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (10 components)

Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 AGABS4 +2 more PR2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility. (3)

Storage (Duration 1h) GSES 1 LIMITED New Build Generating CMU Ferrymuir Ferrymuir +1 more KY15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (1 component)

1.000MW of battery storage located at Staffordshire.

DSR GSES 1 LIMITED Unproven DSR CMU ABS1 ST10
Inactive • 2020-21 (T-1)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (2 components)

1.000MW of battery storage located at Staffordshire. (2)

DSR GSES 1 LIMITED Unproven DSR CMU ABS1 ST10
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (5 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (2B) +1 more ST10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Hungerford Farm, Winchfield, Hook, RG27 8SW (1 component)

1.200MW of battery storage located at Hook.

DSR GSES 1 LIMITED Unproven DSR CMU ABS2 RG27
Inactive • 2020-21 (T-1)
Hungerford Farm, Winchfield, Hook, RG27 8SW (2 components)

1.200MW of battery storage located at Hook. (2)

DSR GSES 1 LIMITED Unproven DSR CMU ABS2 RG27
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Hungerford Farm, Winchfield, Hook, RG27 8SW (5 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (2B) +1 more RG27
Active • 2028-29 (T-4), 2027-28 (T-4) ...