Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GSES 1 LIMITED

13 unique locations (60 components) - Page 1 of 2

Breach Farm Caldwell Swadlincote Derbyshire DE12 6RJ (1 component)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.

Inactive • 2020-21 (T-4)
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (3 components)

0.800MW of battery storage located at Wiltshire. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cleveland Potash Ltd, Boulby Mine, Loftus, Saltburn TS13 4UZ (2 components)

Purpose Build Battery designed to be compliant in the FFR market. (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (3 components)

0.400MW of battery storage located at Stratford-Upon-Avon. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land North of Clayhill, Westoning, MK45 5JD. (3 components)

1.200MW of battery storage located at Westoning. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Larport Farm Larport Lane Dormington Hereford HR1 4EP (7 components)

19.500 MW of battery storage located at Hereford. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lascar Works, Tanpits Road, Bury, BL9 5BY (14 components)

Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.41 MW
Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Loading map...
Showing 10 locations