Active MW: 32.63 MW
Inactive MW: 150.20 MW
Breach Farm Caldwell Swadlincote Derbyshire DE12 6RJ (1 component)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.

Inactive • 2020-21 (T-4)
Bodelwyddan, Royal Welch Ave, Bodelwyddan, Rhyl LL18 5TQ, United Kingdom (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
BOC Fawley, Cadland Road, Hythe, SO45 3NX (21 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production processes. DSR delivered through reduction of import at site boundary, primarily process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (2 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …

Active • 2028-29 (T-4)
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (5 components)

1.200MW of battery storage located at Durham.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
100 Montifichet Road, Westfield, Stratford E20 1GR (64 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …

Active • 2028-29 (T-4), 2027-28 (T-4) ...