Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GSES 1 LIMITED

36 unique locations (180 components) - Page 2 of 2

Active MW: 54.72 MW
Inactive MW: 128.11 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (11 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Lascar Works, Tanpits Road, Bury, BL9 5BY (1 component)

20.000MW of battery storage located at Lascar Works

Inactive • 2020-21 (T-1)
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (1 component)

1.200MW of battery storage located at Durham.

Inactive • 2020-21 (T-1)
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (10 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Lower Road, Brentwood, CM13 1BZ (1 component)

Advanced battery energy storage system

Inactive • 2019-20 (T-1)
New River Head TWRM Shaft & WBS, Amwell Street, Finsbury, London, United Kingdom, EC1R 1XU (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Potash Farm, Nash Road, Beachampton, MK19 6EA (9 components)

49.900MW one-hour duration battery energy storage facility.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (2 components)

20.000 MW of battery storage located at Macclesfield.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (6 components)

20.000 MW of battery storage located at Macclesfield.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
16.86 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (11 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Inactive • 2021-22 (T-4)
Loading map...
Showing 11 locations