GSES 1 LIMITED

12 unique locations (92 components)

Active MW: 54.72 MW
Inactive MW: 128.11 MW
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (6 components)

20.000 MW of battery storage located at Macclesfield.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
16.86 MW
New River Head TWRM Shaft & WBS, Amwell Street, Finsbury, London, United Kingdom, EC1R 1XU (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (10 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Larport Farm Larport Lane Dormington Hereford HR1 4EP (9 components)

19.500 MW of battery storage located at Hereford.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
16.44 MW
Land North of Clayhill, Westoning, MK45 5JD. (5 components)

1.200MW of battery storage located at Westoning.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Hungerford Farm, Winchfield, Hook, RG27 8SW (10 components)
• 1.200MW of battery storage located at Hook.
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (8 components)
• 1.000MW of battery storage located at Staffordshire.
• 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL
• Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (9 components)

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (12 components)
• West Burton B Power Station CMU 1 WB1-18= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-20= 100% T_WBURB-1
• ... and 2 more unique descriptions
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (4 components)

0.400MW of battery storage located at Stratford-Upon-Avon.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (6 components)

0.800MW of battery storage located at Wiltshire.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.65 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (10 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
• Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 12 locations