Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GRIDBEYOND LIMITED

15 unique locations (170 components)

Active MW: 283.98 MW
Inactive MW: 161.02 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)
• existing CHP on site
DSR Combined Heat and Power (CHP) GRIDBEYOND LIMITED Proven DSR CMU Endeco Technologies CMU1 DN16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (12 components)
• existing CHP on site. (2)
• existing on site CHP
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected DN16
Active • 2027-28 (T-4), 2026-27 (T-4) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (12 components)
• existing on site CHP (2)
• existing onsite CHP
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected DN16
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (11 components)

Hamms Hall - Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (15 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383 (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GridBeyond GBD009 LL14
Active • 2028-29 (T-4), 2027-28 (T-4) ...
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (11 components)

Nantwich Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Pond Street London NW3 2QG (8 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD010 Rejected NW3
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS (11 components)

Poole Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components)

Callington - Existing Site CHP unit (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Solvay, Trinity St, Oldbury, B69 4LW (6 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected B69
Active • 2027-28 (T-4), 2026-27 (T-4) ...
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (10 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Staithes Road, Preston, Hull, HU12 8TB (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
The Ridgeway Enfield, Middlesex EN2 8JL (8 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980 (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD010 Rejected EN2
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components)

Warrington Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 15 locations