Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GRIDBEYOND LIMITED

24 unique locations (159 components)

Active MW: 844.26 MW
Inactive MW: 264.22 MW
125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (2 components)

Load reduction on-site and standby generation

Inactive • 2017-18 (T-1)
Aldergrove Nursery, Marsh Road, Southport PR9 8DX (6 components)

Two engines, one of 2.679MW and one of 2.004MW to be supporting a horticultural environment. Primary fuel type = natural gas (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
6.63 MW
Asda Cheltenham, GCHQ, Hubble Road, Cheltenham, GL51 0EX (4 components)

Load reduction (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Asda, EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Asda Fulwood, Bowland View Preston PR3 1LR (4 components)

Combination of load curtailment and standby generation

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Asda Isle of Dogs, 3 Nutmeg Ln, London E14 2AX (6 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Asda Northampton Thornton, Thorton Rd Kingsthorpe, Northampton, NN2 6LS (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Asda Wortley Oldfield Lane, Unit 5 Brown Lane West, Leeds. LS12 6BF (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Asda Wrexham, Wrexham Industrial Estate Wrexham LL13 9UG (8 components)

Load reduction

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Barrow Man Road Birchington Kent CT7 0AX (12 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU (4 components)

20 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU

LIMEJUMP LTD Rejected BS11
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (11 components)
• Load drop.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Combe Park, Bath, BA1 3NG (2 components)

Standby generation x 2

Inactive • 2017-18 (T-1)
Cornwall Energy Recovery Centre St Dennis Cornwall PL26 8DY (5 components)
• Existing Energy from Waste Plant
• New Build Energy from Waste Plant
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
entre Bailey Road,Central Park, Rugby CV23 0PD (2 components)

Load curtailment & standby generation

Inactive • 2017-18 (T-1)
Fellside CHP Sellafield Ltd Seascale Cumbria CA20 1PG UK (5 components)

Fellside CHP is located in Seascale- Cumbria- UK and consists of three GE Frame 6581B gas turbines which are able to run on natural gas or distillate. The primary purpose …

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land East Of Edgemoor Titchsborough Hill Otterham Station Camelford Cornwall PL32 9XU (8 components)
• A new build diesel and/or gas dual fuel generating station consisting of 47 generator units of 440KW each
• An operational 20 MW diesel fuelled generating station with existing T-1 and T-4 CM Contracts.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Main Street, Burstwick, Hull, HU12 9EA (6 components)

Two engines of 2.7MW each and one of 1.9MW, all CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Portbury, Bristol, BS20 7XS (11 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2021-22 (T-4), 2018-19 (T-1) ...
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (11 components)

10MW battery energy storage facility at Upton Lane, Rownhams

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (7 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 24 locations