Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GREENLINK INTERCONNECTOR LIMITED

4 unique locations (72 components)

Active MW: 0.00 MW
Inactive MW: 519.12 MW
KILN DRIVE DE56 (2 components)
• Greenlink is a subsea and underground electricity interconnector cable (with associated converter stations) linking the existing electricity grids in Ireland and Great Britain. The Greenlink Interconnector has granted Grid Connection capacity of 504MW. Greenlink will provide a new grid connection between EirGrid?s Great Island substation in County Wexford (Ireland) and National Grid?s Pembroke substation in Pembrokeshire (Wales).
• Output metered net of Station Load - no separate metered auxiliary exists
Active • 2025-26 (T-1), 2018-19 (T-4)
123.48 MW
GREENLINK INTERCONNECTOR CONVERTER STATION, PWLLCROCHAN, PEMBROKE, SA71 5TP (3 components)

Greenlink is a subsea and underground electricity interconnector cable (with associated converter stations) linking the existing electricity grids in Ireland and Great Britain. The Greenlink Interconnector has granted Grid Connection …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
DN11 (65 components)
• Domestic EV
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
136.08 MW
Chandlers Road St. Albans Hertfordshire AL4 (2 components)
• Greenlink is a subsea and underground electricity interconnector cable (with associated converter stations) linking the existing electricity grids in Ireland and Great Britain. The Greenlink Interconnector has granted Grid Connection capacity of 504MW. Greenlink will provide a new grid connection between EirGrid?s Great Island substation in County Wexford (Ireland) and National Grid?s Pembroke substation in Pembrokeshire (Wales).
• Output metered net of Station Load - no separate metered auxiliary exists
Active • 2028-29 (T-4), 2018-19 (T-4)
123.48 MW
Loading map...
Showing 4 locations