FLEXITRICITY LIMITED

787 unique locations (10054 components) - Page 1 of 32

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
100 The Jewel, Brunstane, Edinburgh, EH15 3AR (6 components)
Active • 2021-22 (T-4), 2022-23 (T-1) ...
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (2 components)

2 x gas fired CHP generators located at a horticultural site.

Active • 2024-25 (T-4), 2028-29 (T-4)
18-20 Langthwaite Rd, South Kirkby, Pontefract WF9 3AP (15 components)
• Load reduction
• Load shedding
Active • 2020-21 (T-4), 2021-22 (T-4) ...
2 Engineers Way, Wembley, Middlesex, HA9 0JS (14 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2024-25 (T-1), 2025-26 (T-1) ...
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (14 components)
• District heating implementation of two gas CHP engines with no auxilliary load
• Two 3.0 MW gas CHP engines. Primary fuel type = Natural Gas
Active • 2022-23 (T-4), 2023-24 (T-4) ...
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2023-24 (T-1), 2023-24 (T-4) ...
4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA (5 components)

New CHP engine to be installed at 4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA

Active • 2022-23 (T-1), 2025-26 (T-4)
4 Norman Rd, Belvedere DA17 6LD (3 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2021-22 (T-4), 2022-23 (T-4) ...
5.33 MW
6 Firswood Rd, Lathom, Skelmersdale WN8 8UT (4 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2021-22 (T-4), 2022-23 (T-4) ...
5.33 MW
77 Oldham Road, Manchester, Lancashire M4 5AA (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Active • 2021-22 (T-4)
91 Chesterfield Rd, Lichfield WS13 6QW (1 component)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4)
9 Handyside St, Kings Cross, London N1C 4BH (21 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2022-23 (T-4), 2023-24 (T-4) ...
ABBOTSHAUGH RESERVE POWER FACILITY, ABBOTTS ROAD, FALKIRK, FK2 7XU (2 components)

Front of the meter 10 x 2MW Gas Reciprocating Engines installed to generate power and export to the local Distribution Network.

Active • 2025-26 (T-4)
Asda, Armadale Station Station Road, Armadale, EH48 3PR (8 components)

Load curtailment

Active • 2022-23 (T-1), 2023-24 (T-1) ...
4.75 MW
ASDA Ayr, Liberator Drive , Ayr, KA8 9BF (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Barking, Genoa Building, Barking, IG11 8FJ (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Barnsley, Old Mill Lane , Barnsley, S71 1LN (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Barry, Ffordd Y Mileniwm, Barry, CF62 5AT (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
0.02 MW
ASDA Basildon, Heron Retail Park Miles Grey Road, Basildon, SS14 3AS (14 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2021-22 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Bearsden, 80 Milngavie Road Bearsden, Glasgow, G61 2TX (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2019-20 (T-1), 2020-21 (T-4) ...
4.80 MW
ASDA Blackpool, Cherry Tree Road, Blackpool, FY4 4QH (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Blackwood, High Street, Blackwood, NP12 0NT (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Blantyre, Clydeview Shopping Centre Glasgow Road, Glasgow, G72 0AQ (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
Asda Boston, Sleaford Road PE21 8EQ (7 components)
• Load curtailment from refridgeration
• Load drop
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2021-22 (T-4), 2022-23 (T-1) ...
8.43 MW
ASDA Brighton Hollingbury, Unit1 Crowhurst Road , Brighton, BN1 8AS (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
Loading map...