FLEXITRICITY LIMITED

818 unique locations (10850 components) - Page 30 of 33

Active MW: 687.81 MW
Inactive MW: 2444.57 MW
HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE (6 components)

CHP engines to be installed at: HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE

Active • 2025-26 (T-4), 2022-23 (T-1)
Hallsville Quarter District Heat Network, Rathbone Street, London, E16 1GU (2 components)

1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export.

Active • 2028-29 (T-4), 2025-26 (T-1)
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (45 components)

load curtailment at site

Active • 2028-29 (T-4), 2024-25 (T-4) ...
11.07 MW
HAYES GARDENS, ENDERBY, LEICESTER, LEICESTERSHIRE, LE19 (9 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2023-24 (T-1) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (12 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.00 MW
Hempstead Lane, Hempstead, Gloucester GL2 5LF (17 components)
• A standby diesel generator on a waste water treatment works.
• A standby diesel generator on a waster water treatment works.
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.00 MW
Hereford - Chelthenham and Worcester HR4 9AA (1 component)

Commercial sites

Active • 2024-25 (T-1)
2.04 MW
High Street, Edinburgh, EH33 1LP (19 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
High Street, Waterham, nr Faversham, Kent ME13 9EJ (14 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Two of six CHP engines horticultural environment with no auxiliiary load
Active • 2027-28 (T-4), 2025-26 (T-1) ...
HILLCREST MOUNT, LEEDS, LS16 (9 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2023-24 (T-1) ...
HUMBERSTONE ROAD, GRIMSBY, DN32 8HW (6 components)

CHP engines to be installed at HUMBERSTONE ROAD, GRIMSBY, DN32 8HW

Active • 2025-26 (T-4), 2022-23 (T-1)
Hunter Boulevard, Magna Park, LE17 4XN (5 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Joan Ln, Bamford, Hope Valley S33 0AW (6 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2027-28 (T-4), 2023-24 (T-4) ...
3.56 MW
Joan Ln, Bamford, Hope Valley S33 0BE (1 component)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4)
3.60 MW
John Milne Ave, Rochdale OL16 4NR (4 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
LADYSMITH ROAD, GRIMSBY, DN32 9EE (5 components)

CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE

Active • 2025-26 (T-4), 2022-23 (T-1)
Land off Station lane, Monkton Mains, Wormald Green, Harrogate HG3 3QA (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (15 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
M21 (24 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
M74 Eco Park, Carlisle Road Lesmahagow ML11 0GU (3 components)

Load curtailment from on-site equipment in response to Flexitricity signal.

Active • 2028-29 (T-4)
7.99 MW
Magna House, Stafford Park 3, Telford, Shropshire, TF3 3BH (10 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Active • 2028-29 (T-4), 2025-26 (T-1)
Magna Park, Hunter Blvd, Bitteswell, Lutterworth LE17 4XN (4 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
MAINGAIT MEDWAY, NEWCRAIGHALL, EH21 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Marsh Leys, Woburn Rd, MK43 9AB (4 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Marsh Road, Banks, Southport PR9 8DX (34 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2023-24 (T-4) ...