Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

105 unique locations (853 components) - Page 3 of 5

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
High Street Waterham Kent ME13 9EJ (6 components)

6 CHP engines of 1.5MW each. Primary fuel type = Natural Gas

Active • 2020-21 (T-4), 2017-18 (T-1)
Holditch Power Station Holditch Road Lymedale Business Park Newcastle under Lyme ST5 9JA (8 components)

Three reciprocating engines each with 2.66MW capacity. Primary fuel type = Natural Gas

Active • 2020-21 (T-4), 2017-18 (T-1)
Hubble Road, Cheltenham, GL51 0EX (6 components)
• Load reduction
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2022-23 (T-4), 2021-22 (T-4)
Iceland Foods 5 Solar Way Innova Park Brimsdown Enfield EN3 7XY (9 components)

Mix of load reduction and standby generation

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Iceland Foods Penzance Drive Swindon Wiltshire SN5 7JF (7 components)

Mixture of load reduction and standby generation.

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Iceland Foods Second Avenue Deeside Industrial Park Deeside Flintside CH5 2NW (9 components)

Mix of load reduction and standby generation

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Ide Hill Road, Bough Beech, Edenbridge TN8 7PJ (7 components)

Standby generation

Active • 2020-21 (T-4), 2017-18 (T-1)
Joan Ln, Bamford, Hope Valley S33 6RB (7 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2021-22 (T-4), 2017-18 (T-1)
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (9 components)

Mix of load reduction and standby generation

Active • 2022-23 (T-4), 2021-22 (T-4) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (19 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Kings Park Road, Moulton Park, Northampton, NN3 6NW (8 components)
• Load curtailment on site and standby generation
• Load reduction on site via standby generation
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Knypersley Generator Unit G Forge Way Brownlees Industrial Estate Knypersley Stoke on Trent ST8 7DN (6 components)

Four reciprocating engines 1.7MW and one of 1.6MW capacity. Primary fuel - gasoil

Active • 2020-21 (T-4), 2017-18 (T-1)
Land on Jameston Farm, Dalry Ayrshire KA24 4EY (1 component)

Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.

Inactive • 2022-23 (T-4)
London Road, Redhill, Surrey RH1 1LJ (5 components)

2 x POSGU , each 0.8MW

Active • 2021-22 (T-4), 2018-19 (T-1)
Lyndon, West Bromwich, West Midlands B71 4HJ (7 components)
• Load curtailment on site via standby generation
• Standby generation supporting load curtailment
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Main Street, Brough, East Yorkshire HU15 2PR (8 components)

Two assets 1.4MW and 1.9MW, both CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas

Active • 2020-21 (T-4), 2017-18 (T-1)
Main Street, Burstwick, Hull, HU12 9EA (7 components)

Two engines of 2.7MW each and one of 1.9MW, all CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas

Active • 2020-21 (T-4), 2017-18 (T-1)
Manchester Mail Centre, 77 Oldham Road, Manchester, Lancashire M4 5AA (6 components)

Standby generation

Active • 2020-21 (T-4), 2017-18 (T-1)
Manchester Rd, Carrington, Manchester M31 4TG (32 components)

load curtailment at site

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Meerbrook, Leek, Staffordshire, ST13 8TQ (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Melrow Nursery, Rydings Lane, Southport, Merseyside PR9 8EB (6 components)

One 2.679MW gas CHP engine in a new energy centre supporting a horticultiral environment. Primary fuel type = natural gas

Active • 2020-21 (T-4), 2017-18 (T-1)
Mill Lane, Chilham, Kent CT4 8EF (1 component)

Load drop

Inactive • 2021-22 (T-4)
Minerva Road, Farnworth, Bolton, BL4 0JR (10 components)
• CHP generating for site load, which exceeds generating capacity. No aux load.
• CHP generating in NHS hospital. No aux load.
Active • 2022-23 (T-4), 2019-20 (T-1) ...
Monument Road, Bicker, Lincolnshire PE20 3DJ (8 components)
• Load curtailment and standby generation
• Load curtailment at site via standby generation
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Musgrove Park Hospital, Parkfield Drive, Taunton TA1 5DA (13 components)

2 x POSGU (each 1MW)

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations