Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

14 unique locations (285 components)

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (14 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2024-25 (T-1), 2025-26 (T-1) ...
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2023-24 (T-1), 2023-24 (T-4) ...
9 Handyside St, Kings Cross, London N1C 4BH (21 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2022-23 (T-4), 2023-24 (T-4) ...
Ashgrove Road West, Aberdeen AB16 5UL (26 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
Beach Esplanade, Aberdeen AB24 5NR (15 components)

District heating implementation with one asset 1MW and no auxiliary load

Active • 2024-25 (T-4), 2025-26 (T-4) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (17 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
High Street, Waterham, nr Faversham, Kent ME13 9EJ (14 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Two of six CHP engines horticultural environment with no auxiliiary load
Active • 2023-24 (T-1), 2023-24 (T-4) ...
Montgomery Road, Aberdeen AB24 2YA (28 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
Northmoor Lane, Cottingham, Hull HU16 4JN (10 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load

Active • 2023-24 (T-1), 2024-25 (T-1) ...
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (28 components)
• CHP at a horticultural environment.
• CHP at horticultural site
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2024-25 (T-4), 2025-26 (T-4) ...
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (49 components)
• One of three CHP in a horticultural environment
• One of three CHP in a horticultural environment.
Active • 2022-23 (T-1), 2023-24 (T-1) ...
School Road, Aberdeen AB24 1TU (25 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (6 components)

One 2MW gas CHP engine in a horticultural environment

Active • 2023-24 (T-1), 2024-25 (T-1) ...
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (16 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2022-23 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 14 locations