Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FRP MERCIA HOLDCO LIMITED

8 unique locations (389 components)

Active MW: 376.05 MW
Inactive MW: 332.27 MW
Asda ADC, Foxbridge Way, Normanton, WF6 1TL (12 components)
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
• Reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2025-26 (T-4) ...
ASDA Ambient Depot, Earls Road, Earlsgate Park Grangemouth, FK3 8UU (11 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2024-25 (T-4) ...
EDF Energy, Hinkley Point B power station, Nr Bridgwater, Somerset, TA5 1UD (56 components)
• Hinkley Point B Power Station CMU 7: [HP7-22] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 7: [HP7-23] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 8: [HP8-23] T_HINB-8 + (50% x T_HINB-D)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (125 components)
• Aux. load separately metered
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• GT8
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Land at Union Street, Masbrough, Rotherham S61 1AA Rotherham (7 components)

Reciprocating genset in acoustic enclosure

Active • 2024-25 (T-4), 2021-22 (T-1)
Land at Union Street, Masbrough, Rotherham S61 1AA Rotherham (10 components)
• 10 MW Storage facility located at Cheadle.
• CMU consisting of multiple reciprocating engines and alternators
• Reciprocating genset in acoustic enclosure
Active • 2024-25 (T-4), 2022-23 (T-3) ...
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)
• BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity
• Reciprocating genset in acoustic enclosure
Active • 2024-25 (T-4), 2021-22 (T-4)
Loading map...
Showing 8 locations