Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FRP MERCIA HOLDCO 2 LIMITED

5 unique locations (94 components)

Active MW: 292.04 MW
Inactive MW: 416.27 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (23 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Ormskirk and District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (6 components)
• 1 x gas reciprocating engine with a total rated gross power capacity of 0.900 MW and a net power capacity of 0.869 MW
• Gas reciprocating engine
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Par CHP, Par Docks, Par, St. Austell, PL24 2BN (16 components)
• CHP unit
• Gas CHP located in St. Austell
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Rocks Dryer, Rosvear Road, Bugle, St. Austell, PL26 8PJ (14 components)
• Gas CHP
• Gas CHP in St. Austell
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 5 locations