Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FRP MERCIA HOLDCO 2 LIMITED

118 unique locations (1795 components) - Page 1 of 5

Active MW: 302.57 MW
Inactive MW: 405.74 MW
2600 John Smith Drive, Oxford, OX4 2JY (35 components)
• Generating Unit 1
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• Operational gas reciprocating engine.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3 Longwalk Road, Stockley Park, Uxbridge, UB11 1AW (6 components)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (11 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Asda Bournemouth, Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (6 components)
• Load curtailment and standby generation
• Mix of load curtailment and standby generation
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Far Cotton, Kings Park Road, Moulton Park, Northampton, NN3 6NW (6 components)
• Load curtailment on site and standby generation
• Load reduction via standby generation taking onsite load
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Longwell Green, Combe Park, Bath, BA1 3NG (6 components)
• Load curtailment via standby generation
• New reciprocating gensets in acoustic enclosure
• Standby generation x 2
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Rugby, entre Bailey Road,Central Park, Rugby CV23 0PD (5 components)
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• Load curtailment & standby generation
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Swindon Haydon, Windmill Hill Business Park, Swindon, SN5 6QR (6 components)
• Load curtailment and standby generation
• Mix of load curtailment and standby generation
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Bodelwyddan, Royal Welch Ave, Bodelwyddan, Rhyl LL18 5TQ, United Kingdom (6 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
British Gas, New Bridge Ln, Stockport, SK1 2HQ (20 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Britned Convertor station, Gate C, Grain road, Isle of Grain, Kent, ME3 0AE (7 components)
• BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and GB.
• Two CHP engines in horticultural environment with no auxilliary load
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Buttermilk Lane, Bolsover, S44 6AD (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• N/A
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Cascade Works, Wellington Rd, Burton-on-Trent, DE14 2DW (21 components)
• New reciprocating gensets in acoustic enclosure
• Reciprocating genset in acoustic enclosure
• Reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (6 components)
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Clachan Power Station, Cairndow, By Inverary, Argyll, PA26 8BL (5 components)

1 x hydro turbine & synchronous generator

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Club Farm, Pimlico Link Road, Clitheroe BB7 1QW (2 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines
• A new power plant, with associated civil works, switchgear and electrical connection.
Inactive • 2022-23 (T-4), 2020-21 (T-4)
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (20 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (34 components)
• An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck where it will be deposited in a storage bunker, from which it will be fed into two thermal units. Each unit will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Dinas Power Station, which is supplied by water from the Nant-y-Moch reservoir.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy, Heysham 1 power station, Morecambe, Lancashire, LA3 2XF (14 components)
• 49.99MW Lithium-ion Energy Storage System
• Battery energy storage unit
• Peak power plant
Active • 2027-28 (T-4), 2024-25 (T-1) ...
EDF Energy, Heysham 2 power station, Morecambe, Lancashire, LA3 2XH (43 components)
• Heysham 2 Power Station CMU 7: [HY2723] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 7: [HY2724] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 8: [HY2824] T_HEYM28 + (50% x T_HEYM2-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations