FRP MERCIA HOLDCO 2 LIMITED

125 unique locations (2189 components) - Page 5 of 5

Active MW: 292.04 MW
Inactive MW: 416.27 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (56 components)
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
• 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
• A Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Poplar Avenue, King' Lynn, PE34 3AL (14 components)

Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to …

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Ramsgate Road, Sandwich, Kent CT13 9NL (17 components)
• 1,000MW electricity interconnector between GB and Belgian transmission systems
• 1,000MW electricity interconnector between GB and Belgian transmission systems. The Nemo Link interconnector will consist of subsea and underground cables connected to a converter station in each country, which will allow electricity to flow in either direction between the two countries. Nemo Link® will build the converter station on an 8 hectare site, formerly occupied by the Richborough Power Station, which now forms part of the Richborough Energy Park proposals. A similar converter station will be built in the industry zone Herdersbrug in Bruges.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Ratcliffe-on-Soar Nottingham NG11 0EE (100 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Rocks Dryer, Rosvear Road, Bugle, St. Austell, PL26 8PJ (14 components)
• Gas CHP
• Gas CHP in St. Austell
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Russell Farm, Hursley, Winchester SO21 2UZ (13 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (7 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Severn Power Station West Nash Road Nash Newport NP18 2BZ (15 components)
• Existing CCGT Unit
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Soho Farm, Soho, Leigh-Upon-Mendip, Radstock, Somerset, BA3 5RD (4 components)

A new build diesel and/or gas dual fuel generating station consisting of 3 generator units of 500KW each

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Stratford Road, Alcester, B49 6NN (12 components)
• 11 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• 20 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
TALLINGTON WW, PE9 4RJ (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
The Mall, Patchway, Bristol, BS34 5QT (13 components)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Tongland, Kirkcudbrightshire. DG6 4LT. Scotland (19 components)
• Tongland hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
• Tongland hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
• Tongland hydro power station - Unit 3 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Trostre Works Llanelli Carmarthenshire SA14 9SD (125 components)

Manufacturing site providing demand response

Active • 2025-26 (T-1), 2023-24 (T-4) ...
Unit 27A Aber park Aber Road Flint CH6 5EX (15 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Visitors Car Park, Alexandra Park, WA10 3UJ (4 components)
• Diesel or gas generating station.
• gas generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Waterswallows Lane, Buxton, Derbyshire SK17 7JD (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Weighbridge Road, Shotton, Deeside, CH5 2LL (22 components)

Paper mill industrial site

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
WILSTHORPE WS, WILSTHORPE, PE9 4PD (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 25 locations