Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FPC ELECTRIC LAND LIMITED

36 unique locations (349 components) - Page 1 of 2

Active MW: 190.68 MW
Inactive MW: 450.56 MW
165 Fordhouse Lane Stirchley Birmingham B30 3AG (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Beinn An Tuirc 3 Wind Farm, Kintyre Peninsula, Campbeltown, Argyll, PA28 6QY (6 components)

An onshore windfarm consisting of 11 x 3.6MW and 3 x 3.45MW Wind Turbine Generators (WTGs) on the Kintyre Peninsula.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated land within a compound at Belvedere Nurseries
Active • 2025-26 (T-4)
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Drax Power Station, Selby, North Yorkshire, YO8 8PH (76 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EcoPark, Advent Way, Edmonton, London N18 3AG (17 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.

Active • 2025-26 (T-1), 2023-24 (T-4) ...
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (60 components)
• BM Unit T_FFES-2 at Ffestiniog Power Station (Pumped Storage).
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Hull Reserve Power, Staithes Road, Hull, HU12 8DX (7 components)

21 MW power plant comprising 11 gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Lincomb Farm, Lincomb, Stourport-On-Severn, DY13 9RB (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Active • 2027-28 (T-4)
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2026-27 (T-4)
Land at William Nadin Way, Tetron Point, Swadlincote, DE11 0WT (1 component)

2 x 2MW Gas fuelled generator units to be installed on designated land within a compound located at Tetron point

Active • 2024-25 (T-4)
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Active • 2027-28 (T-4)
Land North Of Stoke Lane Dunston Norfolk, NR14 8QD (2 components)

" Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"

Active • 2028-29 (T-4)
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Land off Sir William Smith Road, Kirkton Industrial Estate, D11 3RD (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours

Active • 2027-28 (T-4), 2026-27 (T-4)
Land West Of Kegworth Road, Ratcliffe On Soar, Nottinghamshire,NG11 0EA (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
M74 Gallowflat Rutherglen Scotland G73 1PX (2 components)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (27 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations